- A3 reportLeanStructured problem solving or planning recorded on a single A3 sheet and agreed with the people involved.
- ABC analysisgeneralTechnique that divides items such as procured goods, tasks or costs into three classes according to their share of the total value
- Acceptance criteriageneralTestable conditions agreed in advance that a deliverable must meet in order to be accepted
- Acceptance criteriaPMI / PMBOKCheckable standards, agreed in advance, that decide at acceptance whether a deliverable can be taken over.
- Acceptance recordgeneralWritten documentation of an acceptance with the item inspected, result, defects found, deadlines and signatures
- ActivityISO 21506Defined piece of work without which a project, programme or portfolio cannot be finished; in the schedule it has a duration, start and finish.
- ActivityPMI / PMBOKIn PMI usage, a clearly delimited piece of project work that is planned in the schedule.
- Activity durationgeneralTime span between the start and finish of an activity, measured in working units such as hours, days or weeks
- Activity listgeneralTabular listing of all activities of a project with identifier, description, duration and dependencies
- Activity listPMI / PMBOKIn PMI usage, the register of every activity planned in a project’s schedule, each with its own identifier and a short description of the work involved.
- Activity sequence plangeneralRepresentation of the logical order and dependencies of a project's activities, as yet without specific dates
- Activity-on-arrow networkgeneralForm of network schedule in which activities are shown as arrows and the points in time between them as nodes
- Activity-on-node networkgeneralForm of network schedule in which activities are shown as nodes and their dependencies as connecting arrows
- Actual costISO 21506Costs actually incurred for the project work carried out up to a cut-off date.
- Actual costPMI / PMBOKIn earned value management, the figure showing what the work completed up to a status date has really cost.
- Actual dategeneralThe point in time at which an activity actually started or finished, as distinct from the planned date
- Adaptive approachPMI / PMBOKWay of developing a solution when requirements are unclear and likely to shift, so the result takes shape gradually over short cycles.
- Agile ManifestogeneralStatement of principles from 2001 that sets out four values and twelve principles for agile software development
- Agile project managementgeneralApproach that plans and delivers projects in short cycles, adapts requirements continuously and works closely with users
- Analogous estimatinggeneralEstimating technique that derives effort, duration or cost from the actual values of a comparable earlier project
- Analogous estimatingPMI / PMBOKEstimation of duration or cost that takes the recorded figures of a comparable earlier activity or project as its reference point.
- Analyze phaseSix SigmaThird DMAIC phase: the main causes of variation and defects are identified from the measurement data and confirmed with evidence.
- AndonLeanVisible or audible signal used to report a problem at the workplace immediately so that help arrives and the problem is solved.
- Appropriate Governance BodyPM²Body of the organization that decides on strategy and portfolio in PM², approves projects and releases the funds for them
- AssumptionPMI / PMBOKIn PMI usage, something the planning treats as given even though it has not yet been confirmed or proven.
- AutonomationLeanPrinciple of stopping a process immediately when an error occurs, so that no defective result is passed on and the cause is removed.
B
- Backward passgeneralCalculation of the latest permissible finish and start dates of all activities, working from the project end against the dependencies
- Backward passPMI / PMBOKCalculation in the critical path method that starts at the project end and moves back through the network to find each activity’s latest dates.
- Balanced scorecardgeneralManagement tool translating strategy into measurable objectives and indicators from several perspectives, classically finance, customers, processes and growth
- BaselineISO 21506Approved version of a plan for scope, schedule or cost against which actual project progress is measured.
- BaselinePMI / PMBOKFrozen, approved version of a plan or work product that actual progress is measured against and that only an authorized change may alter.
- Basis of estimateISO 21506Record of the data, assumptions and methods on which an estimate of what the planned activities will need is based.
- BenefitISO 21506Positive effect that an undertaking actually brings about for an organization or its stakeholders, such as savings, better quality or new opportunities.
- BenefitsPMI / PMBOKThe advantages an organization and its stakeholders gain once the outcomes of a project or program take effect.
- Benefits managementgeneralPlanning, tracking and securing the benefits a project or programme is to deliver to the organization, including beyond project end
- Benefits Management ApproachPRINCE2PRINCE2 management product defining how and when a project’s benefits are measured and reviewed, including after the project ends.
- Benefits management planPMI / PMBOKPlan explaining how a project or program will generate, measure, increase and secure its benefits over the longer term.
- Bill of materialsgeneralStructured list of all components, assemblies and materials that make up a product, with quantities and identifiers
- Bill of quantitiesgeneralStructured list of the work to be performed, broken down into individual items with description, quantity and unit, mainly in construction
- Black BeltSix SigmaSix Sigma trained specialist who leads DMAIC improvement projects as the main person responsible, often released fully or largely for this work.
- Blocked workKanbanWork items that cannot progress in the workflow because an impediment prevents work on them; resolving them is part of active management in Kanban
- Bottom-up estimatinggeneralEstimating technique in which individual work packages or activities are estimated and the values added up to an overall estimate
- Bottom-up estimatingPMI / PMBOKEstimation that begins with figures for the smallest units of work and rolls them up level by level into totals for duration or cost.
- BrainstorminggeneralCreativity technique in which a group collects as many ideas as possible on a question in a short time without evaluating them straight away
- Brooks's lawgeneralRule of thumb stating that adding staff to a software project that is already late delays it further
- Budget at completionISO 21506Approved total budget for completing all the work of an activity, work package, control account, project or programme.
- Budget at completionPMI / PMBOKTotal budget for the planned work of a project or part of it; in earned value management, the planned value to be reached at completion.
- Burn-down chartgeneralChart showing the remaining work over time, with an ideal line indicating whether a team is likely to reach its goal
- Burndown chartPMI / PMBOKChart plotting how much work is still open against the time remaining in a timebox, so the team can see whether it will finish.
- Business caseISO 21506Justification of an undertaking that weighs benefits, costs, risks and alternatives and shows why the investment is worthwhile.
- Business casePMI / PMBOKDocumented assessment of benefits, costs and risks that serves as the basis for deciding on an undertaking.
- Business CasePRINCE2PRINCE2 management product justifying why a project is worthwhile, kept up to date throughout the project’s life.
- Business case practicePRINCE2PRINCE2 7 practice that establishes whether a project is worthwhile and keeps asking that question throughout its life.
- Business Governing LayerPM²Top layer of the PM² project organization, at which the organization sets strategy, priorities and investments
- Business Implementation GroupPM²Group of organization and user representatives that plans the business changes in PM² and embeds the project results in daily work
- Business Implementation PlanPM²PM² plan that evaluates what a project changes in the organization and describes the measures needed for the results to deliver benefits
- Business ManagerPM²PM² role that represents the Project Owner in day-to-day project work, coordinates the business side and prepares the organization for the change
C
- ChampionSix SigmaManager who, in Six Sigma, selects, authorizes and resources improvement projects and decides on their progress at the tollgates.
- Change AuthorityPRINCE2PRINCE2 role to which the Project Board delegates decisions on requests for change and off-specifications within defined limits.
- Change controlgeneralDefined procedure by which changes to scope, schedule, costs or results are recorded, assessed, decided on and implemented
- Change controlPMI / PMBOKRegulated route by which every proposed change to baselines, deliverables or documents is reviewed, decided on and recorded traceably.
- Change control boardgeneralBody that reviews change requests in a project and decides whether to approve, reject or defer them
- Change control boardPMI / PMBOKBody with a formal mandate that weighs up change requests and decides whether to approve, postpone or turn them down.
- Change managementgeneralDesigning and supporting change in organizations so that people accept and use new structures, processes or systems
- Change registerISO 21506Continuously maintained overview of all changes raised in a project or programme, with their key details and current status.
- Change requestISO 21506Proposal, submitted in writing, to change a project or programme, stating reasons and effects and put forward for a decision.
- Change requestPMI / PMBOKFormal application that submits a desired change, with reasons and likely effects, to change control for a decision.
- ChecklistgeneralStructured list of items to be checked or completed for a task so that nothing essential is overlooked
- Checkpoint ReportPRINCE2PRINCE2 progress report from a Team Manager to the Project Manager on the status of a work package, produced at agreed intervals.
- ClientgeneralPerson or organization that commissions a project or service, sets its framework and accepts the result
- Closing a projectPRINCE2PRINCE2 process for an orderly end: handing over products, evaluating objectives, securing lessons and recommending closure to the Project Board.
- Closing PhasePM²Last PM² phase, in which the results are handed over, experience is evaluated and the project is closed administratively
- Co-locationgeneralBringing a project team together physically at a shared workplace to improve coordination and cohesion
- Code of accountsPMI / PMBOKNumbering scheme that assigns every WBS element a distinct identifier such as 1.2.3, making costs and dates traceable to it.
- ColocationPMI / PMBOKHousing a project team’s members at one site so that they communicate more easily, cooperate better and work more productively.
- Commercial Management ApproachPRINCE2PRINCE2 7 management product defining how procurement, contracts and working with suppliers are managed in the project.
- CommitmentsgeneralAmount for which a project has already entered into obligations, for example through purchase orders, that has not yet been booked as cost
- Common causegeneralConstantly present, random influences that produce a natural variation of results in every process
- Communication Management ApproachPRINCE2PRINCE2 management product defining who, within and around the project, receives which information, when and through which channel.
- Communication planISO 21506Overview that sets out who in the project receives or supplies which information, when, how often and through which channel.
- Communications management planPMI / PMBOKSubsidiary plan of the project management plan setting out which stakeholders receive which information, in what form, how often and through which channels.
- Competence element: Change and transformationIPMAICB 4 practice competence: assessing need and readiness for change and helping organizations actually use new capabilities
- Competence element: Compliance, standards and regulationsIPMAICB 4 perspective competence: identifying and meeting legal, professional and ethical requirements for a project and using them for the organization
- Competence element: Conflict and crisisIPMAICB 4 people competence: detecting conflicts and crises early, analysing causes, defusing or resolving them and learning from them
- Competence element: Culture and valuesIPMAICB 4 perspective competence: understanding the culture and values of society and the organization and considering their effect on a project
- Competence element: DesignIPMAICB 4 practice competence: deriving a project's management approach from requirements and context and adjusting it regularly
- Competence element: FinanceIPMAICB 4 practice competence: estimating project costs, securing budget and funding, and monitoring and reporting the financial position
- Competence element: Governance, structures and processesIPMAICB 4 perspective competence: fitting a project into an organization's permanent structures, decision paths and support processes
- Competence element: LeadershipIPMAICB 4 people competence: providing direction, guiding individuals and teams and adapting the leadership style to the situation
- Competence element: NegotiationIPMAICB 4 people competence: balancing the interests of different parties, developing options and reaching sustainable agreements
- Competence element: Organisation and informationIPMAICB 4 practice competence: setting up and managing the temporary project organization with roles, information flows and documentation
- Competence element: Personal communicationIPMAICB 4 people competence: exchanging information clearly and completely, suited to the audience, the situation and the culture
- Competence element: Personal integrity and reliabilityIPMAICB 4 people competence: acting on one's own ethical principles, keeping commitments and thereby building trust in the project
- Competence element: Plan and controlIPMAICB 4 practice competence: integrating all subsidiary plans into one plan, controlling progress, managing changes and closing phases
- Competence element: Power and interestIPMAICB 4 perspective competence: recognizing informal interests and power relations around a project and taking them into account for project success
- Competence element: Procurement and partnershipIPMAICB 4 practice competence: obtaining goods and services from outside, selecting suppliers and partners and overseeing contracts
- Competence element: QualityIPMAICB 4 practice competence: planning, checking and assuring the quality of project processes and results throughout the life cycle
- Competence element: Relationships and engagementIPMAICB 4 people competence: building sound relationships and networks and winning others over to shared goals
- Competence element: Requirements, objectives and benefitsIPMAICB 4 practice competence: deriving, structuring and prioritizing a project's objectives, benefits and requirements from stakeholder expectations
- Competence element: ResourcefulnessIPMAICB 4 people competence: analysing problems with different ways of thinking and creative techniques and finding new solutions
- Competence element: ResourcesIPMAICB 4 practice competence: determining, acquiring and allocating the people, means and equipment needed and monitoring their use
- Competence element: Results orientationIPMAICB 4 people competence: keeping the results in view, using means effectively and efficiently and leading results to acceptance
- Competence element: Risk and opportunityIPMAICB 4 practice competence: identifying, assessing and treating opportunities and risks in a project and monitoring them continuously
- Competence element: ScopeIPMAICB 4 practice competence: defining a project's deliverables and boundaries, structuring the scope and breaking it down into work packages
- Competence element: Self-reflection and self-managementIPMAICB 4 people competence: recognizing one's own emotions, values and behaviour patterns and consciously managing work, workload and development
- Competence element: StakeholdersIPMAICB 4 practice competence: identifying stakeholders with their interests and influence, developing an engagement strategy and involving them
- Competence element: StrategyIPMAICB 4 perspective competence: aligning a project with the organization's vision, mission and strategy and continually checking its contribution
- Competence element: TeamworkIPMAICB 4 people competence: assembling and developing a team and making it effective through delegation and learning from mistakes
- Competence element: TimeIPMAICB 4 practice competence: defining, estimating and sequencing a project's activities and monitoring progress
- Configuration managementISO 21506Managing the components, versions and characteristics of a project result so that it is always clear which version applies.
- Configuration management systemPMI / PMBOKFramework of procedures stating which project artifacts are under version control and how their valid state and any changes to it are safeguarded.
- Conflict managementgeneralRecognizing, handling and resolving conflicts in a project before they jeopardize collaboration, schedules or results
- ConstraintgeneralFixed condition that limits a project's room for manoeuvre, such as a fixed date, a budget cap or an official requirement
- ConstraintPMI / PMBOKLimit or requirement, such as a fixed deadline, a capped budget or a regulation, that narrows the options for carrying out an undertaking.
- Contingency plangeneralResponse planned in advance and triggered when a known risk occurs, in order to limit its consequences
- Contingency planPMI / PMBOKSet of responses agreed beforehand that the team puts into action as soon as defined trigger conditions arise.
- Contingency reservePMI / PMBOKBuffer of time or money for risks already identified, deliberately built into the baseline and at the project manager’s disposal.
- Continued business justificationPRINCE2PRINCE2 principle: a project must remain worthwhile throughout its life; if the justification is lost, it is changed or stopped.
- ContractgeneralLegally binding agreement between parties that governs performance, consideration, dates and the rights and obligations of both sides
- Contract claimgeneralDemand by a contracting party for additional payment, more time or other entitlements arising from deviations from the contract
- Contract managementgeneralManagement of a contract from preparation through execution and changes to termination and archiving
- ContractorgeneralPerson or organization that is contractually obliged to deliver an agreed service for a client
- ControlISO 21506Ongoing comparison of the project's status with the plan and initiation of action when variances put the objectives at risk.
- Control accountISO 21506Point at which the work content, schedule, budget and actual costs of one part of a project come together and are owned jointly.
- Control accountPMI / PMBOKChosen point in the WBS with its own responsible person where planned and actual data meet and performance is assessed using earned value.
- Control chartgeneralChart that shows measured values of a process over time with a centre line and control limits in order to detect changes in the process
- Control limitgeneralLimit on a control chart, calculated from the natural variation of a process, whose violation triggers an investigation
- Control phaseSix SigmaFinal DMAIC phase: the improvement achieved is secured, handed over to the process owner and the project is closed.
- Control planSix SigmaSpecification of which characteristics of an improved process are monitored, how, how often and by whom, and what happens when they deviate.
- Controlling a stagePRINCE2PRINCE2 process in which the project manager runs a stage: assigning work, checking progress, reporting and responding to deviations.
- Corrective actionISO 21506Action that remedies a variance that has already occurred; in quality management, removing the cause of a defect so that it does not recur.
- Corrective actionPMI / PMBOKResponse to a deviation that has already occurred; it tackles the cause and brings project work back to what the project management plan lays down.
- Cost estimationgeneralDetermining the expected costs of a project or its parts on the basis of scope, prices and assumptions
- Cost managementgeneralEstimating, planning, budgeting, monitoring and controlling the costs of a project so that it stays within the approved budget
- Cost management planPMI / PMBOKSubsidiary plan of the project management plan with the rules for cost estimating, budgeting and cost control, such as accuracy, units and thresholds.
- Cost of Poor QualitySix SigmaCosts incurred because a process produces defects or fails to meet requirements, including follow-on costs that are hard to see.
- Cost of qualitygeneralCosts arising from preventing, detecting and correcting defects, divided into prevention, appraisal and failure costs
- Cost of qualityPMI / PMBOKSum of the expenses for preventing defects, for inspection and for the consequences of failures over the whole life of a product.
- Cost performance indexgeneralRatio of earned value to actual cost; values below one mean that the project is working at higher cost than planned
- Cost performance indexPMI / PMBOKCost efficiency indicator obtained by dividing earned value by actual cost (CPI = EV / AC).
- Cost planninggeneralSpecifying which costs may be incurred when and for which parts of a project, as the basis for budget and cost control
- Cost trend analysisgeneralTracking the forecast total cost of a project across several reporting dates in order to detect cost developments early
- Cost varianceISO 21506Difference between the value of the work performed and the actual cost incurred for it; a negative value means more expensive than planned.
- Cost variancePMI / PMBOKBudget deviation at a status date, found by subtracting actual cost from earned value (CV = EV − AC).
- Cost-reimbursable contractgeneralContract under which the client reimburses the costs actually incurred and also pays a fee for profit
- Cost-reimbursable contractPMI / PMBOKContract type in which the buyer pays the seller’s allowable actual costs and, on top, a fee that represents profit.
- CrashinggeneralShortening activity durations on the critical path by adding resources, usually at higher cost
- CrashingPMI / PMBOKIn PMI usage, schedule compression that brings in extra resources to cut duration, choosing the options with the lowest added cost.
- Creativity techniquegeneralMethod that helps individuals or groups develop new ideas and solutions systematically
- Crisis managementgeneralApproach for stabilizing a project in an acute situation that threatens its existence and keeping it able to act
- Critical activitygeneralActivity without scheduling latitude whose delay has a direct effect on the project end
- Critical chain methodgeneralPlanning method that takes resource bottlenecks into account and pools the safety margins of individual activities in shared buffers
- Critical chain methodPMI / PMBOKScheduling method that accounts for scarce resources and pools safety time into shared buffers on paths.
- Critical pathISO 21506Sequence of activities in the network schedule without float whose total duration determines the earliest finish of a project or phase.
- Critical pathPMI / PMBOKThe chain of activities that takes longest from start to finish and therefore fixes the minimum time the project can take.
- Critical path activityPMI / PMBOKActivity on the critical path; any delay to it immediately moves the project end date.
- Critical path methodgeneralCalculation method of the network planning technique that determines dates, float and the critical path from durations and dependencies
- Critical path methodPMI / PMBOKCalculation technique that derives early and late dates, float and the critical path from durations and dependencies.
- Critical to QualitySix SigmaMeasurable characteristic of a product or process that is decisive for quality from the customer’s point of view, with target value and limits.
- CustomergeneralPerson or organization that receives the project result and judges its benefit; it can be the client, the user or both
- Customer requirements specificationgeneralDescription prepared by the client of all requirements for a result: what is to be delivered and for what purpose
- Cycle TimeKanbanFlow metric in Kanban: the time elapsed between the start and the finish of a completed work item
D
- Daily LogPRINCE2The PRINCE2 Project Manager’s working record of informally handled issues, actions, events and observations during the project.
- Daily ScrumScrumDaily 15-minute event in which the Developers inspect progress towards the Sprint Goal and plan the work for the following day
- Data datePMI / PMBOKStatus date at which project progress is captured; in the schedule it separates recorded actuals from the remaining plan.
- Decision tree analysisgeneralMethod that represents decisions under uncertainty as a branching tree and compares the alternatives by their expected value
- Decision tree analysisPMI / PMBOKGraphical calculation method that lays out decision alternatives and their uncertain consequences as branches and evaluates them.
- DecompositionISO 21506Step-by-step refinement of an undertaking into smaller parts that are easier to plan and control, repeated as more detail becomes known.
- DecompositionPMI / PMBOKTechnique for breaking a large scope of work or deliverables down level by level until parts emerge that can be estimated and controlled.
- Defects per Million OpportunitiesSix SigmaMeasure of how often a process produces defects: the number of defects scaled to one million opportunities for a defect.
- Define phaseSix SigmaFirst DMAIC phase: the problem, goal, scope, customer requirements and team of an improvement project are set and recorded in the project charter.
- Define roles, responsibilities and relationshipsPRINCE2PRINCE2 principle: every project needs agreed roles, clear responsibilities and deliberately managed relationships between those involved.
- Definition of DoneScrumBinding description of the quality a result must reach to count as an Increment; the commitment belonging to the Increment
- Definition of WorkflowKanbanExplicit shared understanding among the members of a Kanban system of what flow means in their context, with specified minimum elements
- Delegated authoritygeneralRight assigned to a person or role to take decisions, use resources or give instructions in a project
- DeliverableISO 21506Verifiable result that is produced in a project and handed over to the client, users or subsequent work.
- DeliverablePMI / PMBOKVerifiable result, such as a product, a document or a capability, without which the process, phase or project concerned cannot be closed.
- Deliverables Acceptance Management PlanPM²PM² plan that sets out criteria, steps, responsibilities and schedule for the formal acceptance of the deliverables
- Delphi techniquegeneralStructured survey method in which experts give assessments in several anonymous rounds and gradually bring them closer together
- DependencygeneralRelationship in which an activity, result or project relies on another in order to start or finish
- DependencyPMI / PMBOKIn PMI usage, a relationship in which one activity, result or project relies on another, usually modelled as a logical relationship.
- Design for Six SigmaSix SigmaSix Sigma approach for developing new products, services or processes that are meant to meet customer requirements reliably from the start.
- Design of experimentsgeneralMethod of planning and analysing experiments so that the effects of several factors and their interactions can be shown with little effort.
- Design reviewgeneralPlanned, formal assessment of a design by experts to check whether it meets the requirements and to uncover problems early
- Design thinkinggeneralUser-centred innovation approach that solves problems through understanding users, ideation, prototyping and testing in repeated loops
- Design thinkingPMI / PMBOKHuman-centred approach that understands problems from the users’ perspective and develops solutions step by step through prototypes and tests.
- DeveloperScrumAccountability in the Scrum Team for everyone who creates the usable Increment in a Sprint, regardless of discipline or job title
- Directing a projectPRINCE2PRINCE2 process of the Project Board: granting authorizations, giving direction and deciding on exceptions from start to closure.
- Directing LayerPM²Layer of the PM² project organization, formed by Project Owner and Solution Provider, that champions the project, owns the Business Case and provides resources
- DMAICSix SigmaFive-step approach for Six Sigma improvement projects on existing processes: Define, Measure, Analyze, Improve and Control.
- Dummy activitygeneralActivity without duration or resources that serves only to represent dependencies correctly in an activity-on-arrow network
- DurationPMI / PMBOKSpan of working time, counted in workdays or weeks, that an activity occupies from start to finish, with weekends and holidays left out.
E
- Early finish dategeneralEarliest possible point in time at which an activity can be completed if it starts on its early start date
- Early finish datePMI / PMBOKEarliest possible moment at which an activity not yet completed can end; determined by the forward pass.
- Early start dategeneralEarliest possible point in time at which an activity can start if all predecessors are completed on schedule
- Early start datePMI / PMBOKEarliest possible moment at which an activity not yet completed can begin; determined by the forward pass.
- Earned valueISO 21506Monetary value of the work actually finished by a cut-off date, measured with the budget that was planned for that work.
- Earned valuePMI / PMBOKBudgeted value of all work actually completed up to a given date.
- Earned value managementISO 21506Method for judging how far and how efficiently a project or programme has progressed by combining scope, schedule, budget and actual cost.
- Earned value managementPMI / PMBOKMethod linking scope, schedule and resources so that the progress and performance of a project can be measured objectively and forecast.
- Earned value management planningISO 21506Preparatory planning that sets out how a project builds its measurement of performance: baseline, crediting rules, responsibilities and reports.
- Earned value measurementsISO 21506Figures from which the earned value of a project or programme is derived and interpreted for control purposes.
- EffortPMI / PMBOKAmount of work, in person-hours or person-days, that an activity requires, regardless of how many calendar days it is spread over.
- Effort estimationgeneralForward-looking determination of the effort, duration or cost of an undertaking on the basis of available information and experience
- EmpiricismScrumCore principle of Scrum: insight is gained through experience, and decisions rest on observation, supported by transparency, inspection and adaptation
- End Project ReportPRINCE2PRINCE2 report by the Project Manager at project closure, assessing the project’s performance against its objectives and the business case.
- End Stage ReportPRINCE2PRINCE2 report by the Project Manager at the end of a management stage, assessing its outcome and preparing the decision to continue.
- Enterprise environmental factorsPMI / PMBOKCircumstances inside and outside the organization that shape the project but lie beyond the direct control of the project team.
- EpicgeneralLarge requirement in agile backlogs that is too big for one iteration and is therefore broken down into smaller items such as user stories
- EpicPMI / PMBOKSizeable, coherent chunk of work that bundles requirements and is split into smaller items such as user stories.
- Estimate at completionISO 21506Forecast of the total cost a project, a programme or part of one will have incurred once all its work is finished, based on the current position.
- Estimate at completionPMI / PMBOKForecast of total cost at project end: costs incurred so far plus the expected cost of the remaining work (EAC = AC + ETC).
- Estimate to completeISO 21506Expected cost of all the work still outstanding at the cut-off date, for example in a project or a single work package.
- Estimate to completePMI / PMBOKForecast of the costs still to come from the status date onwards until all outstanding project work is done.
- Exception (PRINCE2)PRINCE2In PRINCE2, a situation in which the forecast shows that an agreed tolerance will be exceeded, so the level above must decide.
- Exception PlanPRINCE2PRINCE2 plan that, at the project board’s request, replaces a plan whose tolerances are forecast to be exceeded.
- Exception ReportPRINCE2PRINCE2 report from the Project Manager to the Project Board when a stage or the project is forecast to exceed its agreed tolerances.
- Executing PhasePM²Third PM² phase, in which the team produces the deliverables according to plan and the organization prepares for their introduction
- Executive (PRINCE2)PRINCE2PRINCE2 role: the single person on the Project Board who is ultimately accountable for the project and owns the business justification.
- Expected monetary valuegeneralFigure that multiplies the probability and financial impact of an uncertain event to make risks comparable
- Expected monetary valuePMI / PMBOKStatistical average of an uncertain outcome: the sum of possible impacts, each weighted by its probability.
- Expert judgementgeneralAssessment by people with particular expertise or experience, used in planning, estimating and decision-making in a project
- Expert judgmentPMI / PMBOKJudgment based on expertise in an application area, discipline or industry that is used for a project task.
- Explicit policiesKanbanExplicitly agreed rules for how work items move from one state to the next in a Kanban system; part of the Definition of Workflow
F
- FacilitationgeneralMethodical leading of meetings and workshops that guides a group to results in a structured way without taking sides on content
- Fast trackinggeneralShortening a schedule by carrying out activities originally planned in sequence fully or partly in parallel
- Fast trackingPMI / PMBOKShortening the schedule by letting activities that would normally run one after another overlap in time; saves time but raises the risk of rework.
- Feasibility analysisPMI / PMBOKStudy of whether an undertaking can be carried out under the given technical, economic and organizational conditions.
- Feasibility studygeneralInvestigation carried out before a project into whether an undertaking is technically, economically, legally and organizationally viable
- Finish-to-finishPMI / PMBOKSchedule link in which the end of the predecessor is a precondition for the end of the successor; the starts of both remain free.
- Finish-to-finish relationshipgeneralLogical relationship in which an activity can finish at the earliest once another activity has finished
- Finish-to-startPMI / PMBOKMost common schedule link: the successor can begin at the earliest once the predecessor is complete, so one thing follows the other.
- Finish-to-start relationshipgeneralLogical relationship in which an activity can only start once its predecessor has finished
- Fixed-price contractgeneralContract under which the contractor delivers the agreed work for a total price fixed in advance, regardless of its own costs
- Fixed-price contractPMI / PMBOKContract type in which one set price is agreed for precisely described work, however high the seller’s costs turn out to be.
- FloatgeneralAmount of time by which an activity can be postponed or extended without affecting its successors or the project end
- FlowKanbanThe way potential value moves through a system; the central concept of Kanban, whose optimization balances effectiveness, efficiency and predictability
- Flow metricsKanbanThe four mandatory measures of the Kanban Guide: Work in Progress, Throughput, Work Item Age and Cycle Time
- FMEAgeneralPreventive analysis method that assesses possible failures of a product or process, their effects and causes before they occur
- Focus on products principlePRINCE2PRINCE2 principle: planning and control are organized around the products to be delivered and their agreed quality requirements.
- ForecastPMI / PMBOKReasoned projection of how a project’s costs, dates or scope will develop, updated whenever new data become available.
- Formal acceptancegeneralFormal declaration by the client that a deliverable essentially meets the agreed requirements
- Forward passgeneralCalculation of the earliest possible start and finish dates of all activities, working from the project start along the dependencies
- Forward passPMI / PMBOKCalculation in the critical path method that starts at the project beginning and moves forward through the network to find each activity’s earliest dates.
- Free floatgeneralScheduling latitude an activity can use without any of its direct successors being pushed back
- Free floatPMI / PMBOKLeeway an activity has relative to its immediate successors: how far it can shift before any of them has to start later.
- Functional organizationPMI / PMBOKStructure organized by specialist departments, where staff and budget sit with line managers and project managers have little authority.
- Functional specificationgeneralDescription prepared by the contractor of how, and with what, the requirements of the customer requirements specification are to be met
I
- Imposed dategeneralDate set from outside that an activity or milestone must meet, for example from a contract, grant funding or an authority's deadline
- Improve phaseSix SigmaFourth DMAIC phase: solutions addressing the confirmed causes are developed, selected, piloted on a small scale and introduced.
- IncrementScrumConcrete, usable step towards the Product Goal that adds to all previous results and meets the criteria of the Definition of Done
- Influence diagramgeneralGraphical representation that shows decisions, uncertain variables and objectives as nodes and links their relationships with arrows
- Initiating a projectPRINCE2PRINCE2 process forming the first stage: establishes foundations, plans and controls before the Project Board authorizes the project.
- Initiating PhasePM²First PM² phase, in which a need is turned into project objectives, a Business Case and a Project Charter
- Integrated baseline reviewISO 21506Joint review by client and project team of whether the performance measurement baseline is complete, realistic and understood alike by all.
- IssueISO 21506Problem or unresolved question that has already arisen in a project and must be dealt with and decided so that work can continue.
- IssuePMI / PMBOKProblem or open point that already exists, may endanger a project objective and so must be tracked by an owner and resolved.
- Issue logPMI / PMBOKProject document for capturing issues and following them up, with owner, status and resolution for each.
- Issue Management ApproachPRINCE2PRINCE2 7 management product defining how issues and changes are captured, assessed, decided and followed up.
- Issue registerISO 21506Document in which all issues of a project or programme are recorded together with actions, owners and status.
- Issue RegisterPRINCE2PRINCE2 register for the issues handled formally: requests for change, off-specifications, and problems or concerns.
- Issue ReportPRINCE2PRINCE2 report on a single formally handled issue, with description, impact analysis, recommendation and decision.
- Issues practicePRINCE2PRINCE2 7 practice for handling unplanned events, change requests and deviations that require a decision.
- IterationgeneralRepeated, time-limited work cycle that ends with an intermediate result that can be reviewed
- IterationPMI / PMBOKTime-limited development cycle in which all the work for a usable partial result is carried out.
K
- KaizenLeanJapanese for change for the better: mindset and practice of improving processes continuously in small steps with everyone involved.
- Kaizen eventLeanShort, tightly scoped improvement effort in which a team analyses, changes and trials a process over a few days.
- Kanban boardKanbanVisualization of the Definition of Workflow that makes the work items, states, limits and policies of a Kanban system visible
- Kanban practicesKanbanThe three practices of the Kanban Guide: defining and visualizing the workflow, actively managing work in the workflow and improving the workflow
- Kanban systemKanbanThe Kanban practices as applied in a specific work environment: a defined and visible workflow, actively managed work and continuous improvement
- Kanban system memberKanbanPerson who contributes to delivering value in a Kanban system and shares responsibility for its workflow, policies and improvements
- Kano modelgeneralModel that classifies product features according to how their presence or absence affects customer satisfaction.
- Kick-off meetinggeneralOpening event of a project at which objectives, approach, roles and next steps are presented and agreed together
- Kickoff meetingPMI / PMBOKSession at which a project or phase gets under way: the team and key stakeholders meet to align expectations and launch the work.
- Knowledge managementgeneralSystematic handling of knowledge in projects and organizations: capturing, sharing and preserving it and making it usable for new undertakings
M
- Manage by exception principlePRINCE2PRINCE2 principle: authority is delegated with tolerances; the higher level steps in only when a tolerance is forecast to be exceeded.
- Manage by stagesPRINCE2PRINCE2 principle: the project is planned, monitored and authorized in management stages, each ending with a decision.
- Management information systemISO 21506Hardware and software that gathers data from projects and programmes and turns it into analyses and reports for decision-makers.
- Management reserveISO 21506Portion of the budget held back for unforeseeable work within the agreed scope, released by management and not part of the measurement baseline.
- Management reservePMI / PMBOKPortion of the project budget or schedule time held back for work that nobody foresaw but that lies within the project scope.
- Management StagePRINCE2Section of a PRINCE2 project that the Project Board authorizes as a whole and at the end of which it decides whether to continue.
- Managing a stage boundaryPRINCE2PRINCE2 process at the end of a stage: assessing results, planning the next stage, updating the business case and preparing authorization.
- Managing LayerPM²Layer of the PM² project organization with Project Manager and Business Manager that organizes, monitors and controls the ongoing work
- Managing product deliveryPRINCE2PRINCE2 process at team level: accepting work packages, building and checking products and handing completed results to the project manager.
- Master Black BeltSix SigmaExperienced Six Sigma expert who trains and coaches Black Belts and Green Belts, owns the methods and guides the programme technically.
- Matrix organizationgeneralOrganizational form in which staff are assigned to both their department and a project and are managed by both sides
- Matrix organizationPMI / PMBOKOrganizational form in which staff stay in a functional department while also working on projects, so authority over them is shared.
- Maturity modelgeneralModel that describes an organization's capability in an area such as project management in successive levels
- Measure phaseSix SigmaSecond DMAIC phase: the current performance of the process is captured with verified data and recorded as the baseline for the project goal.
- Measurement system analysisgeneralStudy of whether a measurement system of instrument, method, operator and environment measures reliably enough to support quality decisions.
- Meeting minutesgeneralWritten record of a project meeting with the participants, results, decisions and agreed actions
- MethodologyPMI / PMBOKDefined combination of steps, roles, techniques and rules that guides how work is done in a particular field.
- MilestoneISO 21506Significant point in time for a project, a programme or a portfolio, such as a decision or handover date, already scheduled or still to be fixed.
- MilestonePMI / PMBOKMarked point in the course of a project, programme or portfolio, such as an acceptance or decision, with no duration of its own in the schedule.
- Milestone plangeneralOverview of the key milestones of a project with their planned dates and the results expected at each of them
- Milestone schedulePMI / PMBOKCondensed schedule overview listing only the milestones and their planned dates instead of individual activities, e.g. for management reports.
- Mind mapgeneralGraphical representation of a topic in which subtopics and thoughts are arranged as branches around a central term
- Mind mappingPMI / PMBOKVisual technique that arranges collected ideas radially around a central theme, revealing common ground, differences and gaps.
- Minimum viable productgeneralFirst, deliberately simple version of a product that does just enough to learn from real users whether the idea works
- Minimum viable productPMI / PMBOKFirst version of a solution with the smallest set of features that delivers real value and allows useful feedback.
- Monitor & ControlPM²In PM², the activities spanning all phases with which the Project Manager measures performance, detects deviations and takes corrective action
- Monte Carlo simulationgeneralComputational method that runs a project model thousands of times with randomly drawn values to determine probabilities for dates and costs
- MoSCoW methodgeneralPrioritization technique that divides requirements into must have, should have, could have and won't have this time
- MudaLeanJapanese for waste: any activity that consumes time or resources without creating value for the customer.
- Multi-project managementgeneralOverarching planning and control of several concurrent projects in an organization, especially of their shared resources
- Multipoint estimatingPMI / PMBOKEstimation that captures uncertainty with three values, optimistic, most likely and pessimistic, and derives an expected value from them.
- MuraLeanJapanese for unevenness: irregular distribution of work, volume or pace that causes alternating overload and idle time.
- MuriLeanJapanese for overburden: strain on people or equipment beyond a reasonable level that can be sustained in the long term.
O
- ObeyaLeanJapanese for large room: Lean-style project room in which the objectives, plans, metrics and problems of an undertaking are visibly steered on the walls.
- OpportunityISO 21506Uncertain event or circumstance that, if it occurs, would have a positive effect on a project's objectives.
- OpportunityPMI / PMBOKRisk with a welcome effect, such as lower costs or earlier completion, that can be deliberately exploited or enhanced.
- Organization chartgeneralGraphical representation of an organization showing positions, roles and their reporting relationships
- Organizational breakdown structureISO 21506Hierarchical representation of the organizational units that manage a project or programme and perform its work, including partners.
- Organizational breakdown structurePMI / PMBOKLayered breakdown of the departments, teams and partners involved in a project, linked to the work each unit is responsible for.
- Organizational structuregeneralDivision of an organization into positions and units with their tasks, authority and reporting relationships
- Organizing practicePRINCE2PRINCE2 7 practice that defines roles, responsibilities, decision paths and relationships within the project and with its environment.
- OutcomeISO 21506Change in an organization or its environment that comes about once the result delivered by an undertaking is put to use.
- OutcomePMI / PMBOKWhat a process or project ultimately brings about, such as a changed way of working or a new level of performance.
- OutputISO 21506What a project or programme ultimately delivers: all its deliverables taken together, whether objects, documents or services.
- OutputPMI / PMBOKDirect product of a process or activity, such as a report, software or a service, that often feeds into the next process.
- Overhead costsgeneralCosts that cannot be assigned directly to an individual project or product and are allocated through surcharges
P
- Parametric estimatinggeneralEstimating technique that calculates effort or cost from an established relationship between unit rates and quantities
- Parametric estimatingPMI / PMBOKEstimation that extrapolates cost or duration from historical figures, for example cost per square metre times floor area, or via a regression model.
- Parent elementISO 21506Element of a work breakdown structure whose work has been split into at least two elements on the level below.
- Pareto chartgeneralBar chart that ranks defect types or causes in descending order of frequency or significance and shows the most important at a glance
- PDCA cyclegeneralFour-stage cycle of planning, doing, checking and acting for continual improvement
- Percent completegeneralShare of the planned work of an activity, work package or project that has been performed by a given date, usually as a percentage
- Percent completePMI / PMBOKAssessment, given as a percentage, of what share of an activity’s or work package’s work has been done.
- Performance measurement baselineISO 21506Measurement basis of earned value management: the plan of work and budget spread over time, leaving out the management reserve held back.
- Performance measurement baselinePMI / PMBOKCombined baseline of scope, schedule and cost that serves as the yardstick for measuring project performance.
- Performing LayerPM²Layer of the PM² project organization with Project Core Team and Business Implementation Group that produces the deliverables and puts them into practice
- Permanent organizationgeneralEstablished, lasting organization of a company or public authority from which a project draws staff and resources and to which it hands over results
- PERTgeneralNetwork planning technique that describes activity durations with three estimates and derives expected values and probabilities for dates
- Phase GatePM²Approval point at the end of a PM² phase at which it is checked whether the project may move on to the next phase
- Phase gatePMI / PMBOKFormal decision point between two phases at which an authorized body uses the phase results to decide how the undertaking proceeds.
- Plan-Do-Check-ActPMI / PMBOKFour-step cycle for incremental improvement: plan, do, check the result, act.
- Planned dategeneralCurrently intended start or finish date of an activity, resulting from the schedule that is valid at the time
- Planned valueISO 21506Budgeted value of the work that, according to the baseline, should have been completed by a given cut-off date.
- Planned valuePMI / PMBOKApproved budget for the work that, according to the schedule, should be finished by a given status date.
- Planning assumptiongeneralCircumstance taken as given for planning purposes without yet being reliably confirmed
- Planning PhasePM²Second PM² phase, in which the Project Charter becomes a workable plan with Project Handbook, Project Work Plan and further plans
- Planning PokergeneralTeam estimation technique in which members secretly choose cards with effort values and then discuss the differences
- Plans practicePRINCE2PRINCE2 7 practice describing how plans are prepared at several levels, starting from the products to be delivered.
- PM² MindsetsPM²Attitudes and ways of thinking that help PM² project teams concentrate on what really matters for project success
- Poka-yokeLeanDesign of processes, tools or forms that prevents errors from the outset or makes them visible immediately.
- Policy deploymentLeanLean method for agreeing, cascading and tracking a few strategic breakthrough objectives across all levels of an organization.
- PortfolioISO 21506Collection of projects, programmes and other work that an organization steers jointly in order to put its strategy into practice.
- PortfolioPMI / PMBOKSet of projects, programs, operational work and sub-portfolios that an organization steers as one to carry out its strategy.
- Portfolio componentISO 21506Project, programme, subordinate portfolio or other work that is managed as part of a portfolio.
- Portfolio managementISO 21506Selection, prioritization and ongoing control of all of an organization's projects and programmes with a view to its strategy.
- Portfolio managementPMI / PMBOKCoordinated steering of one or several portfolios so that the organization's undertakings serve its strategy as a whole.
- Portfolio management planPMI / PMBOKDocument that lays down the organization, governance, monitoring and control of a portfolio.
- Portfolio managerISO 21506Person appointed to a portfolio who answers for it contributing to the organization's strategic objectives.
- Portfolio managerPMI / PMBOKPerson or body charged with setting up a portfolio, balancing its components and keeping them under review and control.
- Portfolio planISO 21506Core document of a portfolio: which strategic objectives it pursues, which components belong to it and which plans it is steered by.
- Precedence diagramming methodPMI / PMBOKScheduling technique that draws activities as boxes (nodes) and connects them with arrows for their logical dependencies.
- Predecessor activitygeneralActivity that comes immediately before another in the sequence and on which that activity depends through a logical relationship
- Predecessor activityPMI / PMBOKIn a schedule, the activity on which a dependent activity logically relies and whose timing shapes that activity's dates.
- Predictive approachPMI / PMBOKWay of developing a result that fixes scope, schedule and cost at an early stage and handles later changes through formal control.
- Preventive actionISO 21506Action that removes the cause of a possible variance or defect before it occurs.
- Preventive actionPMI / PMBOKStep taken ahead of time so that upcoming project work does not drift away from what the project management plan intends.
- Probability and impact matrixPMI / PMBOKGrid that ranks risks by combining how likely each one is with how strongly it would affect the objectives.
- Process capabilitygeneralMeasure of whether a stable process produces results with so little variation that they reliably fall within the specification limits.
- Process modelgeneralDefined framework that puts the phases, activities, deliverables and roles of a project into a particular order
- Process organizationgeneralDesign of an organization's workflows in terms of sequence, time, place and responsibility
- ProcurementgeneralAll activities by which a project obtains goods, services or works from external suppliers
- Product BacklogScrumOrdered, continuously evolving list of all work intended to improve a product, and the Scrum Team's single source of work
- Product Backlog itemScrumSingle element of the Product Backlog that describes a piece of work to improve the product, such as a feature, a fix or an investigation
- Product Backlog refinementScrumOngoing activity in which Product Backlog items are broken down, described in more detail, ordered and sized
- Product breakdown structureISO 21506Hierarchical breakdown of a project's result into its sub-products and components.
- Product Breakdown StructurePRINCE2Hierarchical breakdown of all products of a plan in PRINCE2, the starting point of product-based planning.
- Product DescriptionPRINCE2PRINCE2 management product describing the purpose, composition, quality criteria and checking methods of a single product.
- Product GoalScrumLong-term objective of the Scrum Team that describes the state the product is to reach in the future and gives the Product Backlog its direction
- Product life cyclegeneralThe entire path of a product from the idea through development, launch and use to decommissioning
- Product life cyclePMI / PMBOKThe stages a product goes through over its whole existence, from initial concept via launch, growth and maturity to withdrawal.
- Product OwnerScrumAccountability in the Scrum Team that maximizes the value of the product, sets the Product Goal and orders the Product Backlog
- Product RegisterPRINCE2PRINCE2 register of all products in a project with their current status, supporting the management of versions and approvals.
- Production levellingLeanLevelling of production by volume and product mix so that the process runs evenly although orders fluctuate.
- ProgramPMI / PMBOKInterdependent projects and related work steered jointly because coordinated management yields benefits that separate management could not.
- Program evaluation and review techniquePMI / PMBOKEstimating method that combines optimistic, most likely and pessimistic durations into a weighted value to reflect schedule uncertainty.
- Program managementPMI / PMBOKSteering a program with the expertise and principles needed to reach its goals and to gain benefits that its components alone would not deliver.
- Program management planPMI / PMBOKTop-level plan of a program that combines its subsidiary plans and sets the framework for managing the program and each component.
- Program managerPMI / PMBOKPerson the organization empowers to head a program and guide the teams working towards its objectives.
- ProgrammeISO 21506Group of related projects and other work that are steered together in order to achieve an overarching benefit.
- Programme benefitISO 21506Measurable change brought about by a programme that its stakeholders regard as a gain and that moves its objectives forward.
- Programme componentISO 21506Project, subordinate programme or other work that forms part of a programme and contributes to its benefits.
- Programme managementISO 21506Coordinated steering of several related projects that are together meant to achieve an overarching benefit.
- Programme managerISO 21506Person appointed to a programme who answers for the intended benefits and deliverables being achieved.
- Programme planISO 21506Binding core document of a programme that brings the technical requirements and control plans of all components together into one whole.
- Progress practicePRINCE2PRINCE2 7 practice governing how progress is monitored, compared against plans and controlled through tolerances.
- Progress reportISO 21506Regular, brief report on the current state of a project covering progress, variances, risks and the decisions needed.
- ProjectISO 21506Undertaking with a start and an end that is meant to reach set objectives, usually with limited resources and its own organization.
- ProjectPMI / PMBOKTime-limited undertaking that produces something new, whether a product, a service or another result.
- Project assuranceISO 21506Independent, planned review of a project that gives the sponsor and the commissioning organization a reliable view of whether it is on course.
- Project Assurance (PRINCE2)PRINCE2PRINCE2 role through which the Project Board checks, independently of the Project Manager, that the project is sound from business, user and supplier views.
- Project auditgeneralIndependent, systematic examination of a project for achievement of objectives, status, risks and compliance with agreed ways of working
- Project BoardPRINCE2Directing body of a PRINCE2 project made up of Executive, Senior User and Senior Supplier; accountable for success and grants authorizations.
- Project BriefPRINCE2PRINCE2 management product describing a planned project in enough detail for the project board to decide whether initiation may begin.
- Project budgetgeneralTotal funding approved for a project, broken down by work packages, cost types and periods
- Project budgetPMI / PMBOKFunds approved for the project: the cost baseline including contingency reserves plus the management reserve.
- Project calendargeneralCalendar that specifies for a project on which days and at which times work is carried out
- Project calendarPMI / PMBOKCalendar in the schedule model that fixes the days and shifts on which work may be done, turning durations into concrete dates.
- Project Charterfalse friend · PRINCE2PM²PM² artefact that develops the Business Case further and sets out a project's objectives, requirements, risks, milestones and deliverables
- Project charterfalse friend · PRINCE2PMI / PMBOKDocument that authorizes the project and appoints the project manager.
- Project closuregeneralFinal stage of a project in which results are handed over, contracts ended, experience captured and the team disbanded
- Project communicationgeneralAll exchange of information within the project and with its environment, from meetings and reports to events
- Project Core TeamPM²Group on the provider side that carries out the project work and produces the deliverables, coordinated by the Project Manager
- Project culturegeneralShared values, forms of conduct and unwritten rules that shape behaviour in a project
- Project environmentgeneralAll internal and external influences, conditions and parties that act on a project or are affected by it
- Project forecastgeneralEstimate of when a project is likely to finish and what it will cost in total, based on its current status
- Project governanceISO 21506Framework of responsibilities, rules and decision paths that determines who approves a project, who steers it and to whom it is answerable.
- Project governancePMI / PMBOKFramework of structures, rules and decision paths within which a project is directed and overseen.
- Project Handbookfalse friend · PRINCE2, cross-frameworkPM²PM² artefact that brings together a project's management approach, roles, rules, tailoring decisions and all management plans
- Project human resource managementgeneralPlanning, acquisition, deployment, leadership and development of the people who work on a project
- Project initiationgeneralOpening stage of a project in which an idea becomes a commissioned undertaking with an objective, a framework and accountable people
- Project Initiation Documentationfalse friend · cross-frameworkPRINCE2Set of PRINCE2 management products defining the project; the project board authorizes the project by approving it.
- Project Initiation RequestPM²First PM² artefact, formally recording a need, problem or opportunity together with the desired outcomes
- Project initiatorgeneralPerson or body that provides the impetus for a project and drives the idea forward until the decision on starting the project
- Project leadershipgeneralInfluencing people in a project to align them with shared goals, motivate them and hold them together, often without line authority
- Project life cycleISO 21506Sequence of phases that a project passes through from initiation to closure.
- Project life cyclePMI / PMBOKDivision of a project's lifetime into phases, from start to close, whose number and overlap depend on the undertaking and approach.
- Project managementISO 21506Planning, organizing, controlling and closing projects so that their objectives are achieved in terms of time, cost and quality.
- Project managementPMI / PMBOKPlanning, organizing, leading and controlling project work with suitable knowledge, methods and tools so that the requirements are met.
- Project management information systemgeneralSoftware-based environment that brings together the plans, resources, costs, documents and reports of one or more projects
- Project management information systemPMI / PMBOKSet of tools, such as scheduling, cost tracking, document storage and dashboards, in which a project's management data are brought together.
- Project management officeISO 21506Function or organizational unit that makes managing projects easier, for example through methods, support and an overview for senior management.
- Project management officePMI / PMBOKOrganizational unit that harmonizes project management methods and governance across an organization and supports projects in applying them.
- Project management planfalse friend · PRINCE2, cross-frameworkPMI / PMBOKCentral planning document of a project that bundles subsidiary plans and baselines and lays down how the project is run, steered and brought to a close.
- Project management processgeneralDefined sequence of activities used to carry out a management task in a project, such as planning, control or closure
- Project management systemgeneralAll the rules, methods, roles, templates and tools with which an organization plans and controls its projects consistently
- Project management trianglegeneralModel that presents scope, cost and time as interdependent target variables of a project
- Project managerISO 21506Person or position that plans and steers a project on behalf of the client and brings it to completion, with responsibility for its results.
- Project ManagerPM²PM² role on the provider side that runs the project day to day, coordinates the Project Core Team and reports to the Project Steering Committee
- Project managerPMI / PMBOKPerson who heads a project on behalf of the organization, coordinating the work and the team and balancing scope, time, cost and risk.
- Project Manager (PRINCE2)PRINCE2PRINCE2 role that runs the project day to day on behalf of the Project Board and has the products delivered within tolerances.
- Project mandatefalse friend · PRINCE2ISO 21506Document that formally puts a project into effect and grants the project manager their authority.
- Project Mandatefalse friend · ISO 21506, PMI / PMBOK Guide, PM², Six Sigma, cross-frameworkPRINCE2In PRINCE2, the trigger from outside the project by which the commissioning body sets off the preparation of a project.
- Project marketinggeneralMeasures that make a project, its objectives and its benefits known and accepted among those involved and affected
- Project organizationgeneralTemporary organizational structure of a project with its roles, committees, authority and reporting lines
- Project organization chartPMI / PMBOKDiagram of a single project showing its roles, sub-teams, boards and reporting lines, that is, who reports to whom.
- Project OwnerPM²Commissioning role in PM² that sets the business objectives, is accountable for overall success and later takes over the project results
- Project phaseISO 21506Distinct section of the project life cycle with its own result and its own completion.
- Project phasePMI / PMBOKSection of a project with its own focus, such as design or implementation, that ends with completed deliverables and often a review.
- Project planfalse friend · ISO 21506, PMI / PMBOK Guide, PRINCE2, PM²generalIn everyday usage usually the schedule; in the PMBOK Guide, by contrast, a far more comprehensive document.
- Project planfalse friend · PRINCE2, cross-frameworkISO 21506Under ISO 21506, the binding document that brings together a project's technical baselines and its management baselines.
- Project Planfalse friend · ISO 21506, PMI / PMBOK Guide, PM², cross-frameworkPRINCE2PRINCE2 plan showing for the whole project which major products are delivered when, with which resources and at what cost.
- Project planninggeneralWorking out the path to the project result, covering scope, sequence, dates, resources, costs, risks and organization
- Project Product DescriptionPRINCE2Special form of the PRINCE2 product description for the project’s overall output, with quality expectations and acceptance criteria.
- Project Progress ReportPM²PM² report from the Project Manager to the Project Steering Committee on project status compared with the baselines and the Project Charter
- Project reportinggeneralDefined system of regular reports that keeps the project manager, sponsor and governance bodies informed of status, variances and risks
- Project rolegeneralDefined set of tasks, authority and responsibility in a project that is assigned to one or more people
- Project roomgeneralRoom permanently set up for a project, in which the team works, coordinates and makes the project status visible
- Project schedulegeneralPlan that specifies when the activities and milestones of a project are to start and finish
- Project schedulePMI / PMBOKPresentation of planned project dates generated from the schedule model, for example as a Gantt chart, milestone schedule or network diagram.
- Project schedule network diagramPMI / PMBOKDiagram that shows a project's activities and the dependencies between them in their logical order.
- Project scopeISO 21506The work released for a project together with its results, delimited from everything that is explicitly excluded.
- Project scopePMI / PMBOKAll the work a project has to do to deliver its result, as distinct from the features of the result itself; recorded in scope statement and WBS.
- Project Stakeholder MatrixPM²PM² artefact that lists all relevant stakeholders with their contact details and project roles and classifies them where needed
- Project Steering CommitteePM²Central decision-making body of a PM² project, chaired by the Project Owner, that approves Phase Gates and resolves escalations
- Project successgeneralDegree to which a project achieves its agreed objectives and delivers the expected benefit for the client and stakeholders
- Project SupportPRINCE2PRINCE2 role providing administrative and organizational support to the Project Manager, for example with planning, records and configuration management.
- Project Support TeamPM²Optional PM² role for cross-cutting services such as administration, reporting, documentation, quality assurance and architecture advice
- Project teamgeneralGroup of people who jointly carry out the work of a project and are assigned to the project manager for this purpose
- Project Work PlanPM²PM² artefact consisting of work breakdown structure, effort and cost estimates and schedule, used as the baseline for control
- Project-End ReportPM²PM² artefact at the end of a project recording performance, good practices, difficulties and recommendations as a knowledge base
- Project-oriented organizationgeneralOrganization whose output is mainly produced in projects and which aligns its structures and processes accordingly
- Projectized organizationPMI / PMBOKForm of organization in which staff are assigned entirely to projects and the project manager alone decides on priorities, people and resources.
- Provider SidePM²In PM², the participants who build and deliver the solution: Solution Provider, Project Manager and Project Core Team
- Pull principleLeanLean principle under which a step only works or supplies replenishment when the next step or the customer signals a need.
- Pull systemKanbanWay of working in which new work is only started when a clear signal shows free capacity; in Kanban it results from limiting work in progress
Q
- Qualitative risk analysisgeneralAssessment of identified risks by probability and impact on graded scales in order to prioritize them
- Qualitative risk analysisPMI / PMBOKPrioritizing individual project risks by assessing probability, impact and other characteristics.
- QualitygeneralDegree to which the characteristics of a product, service or process fulfil the requirements placed on it
- Quality assuranceISO 21506Part of quality management that builds confidence, through planned and verified ways of working, that quality requirements will be met.
- Quality auditPMI / PMBOKIndependent, structured review of how a project works, revealing departures from applicable rules and good practices worth sharing.
- Quality controlISO 21506Part of quality management that checks work results, identifies deviations from requirements and initiates their correction.
- Quality managementgeneralCoordinated activities with which an organization or project plans, assures, controls and improves the quality of its results
- Quality Management ApproachPRINCE2PRINCE2 management product defining the standards, procedures and responsibilities used to assure the quality of the products.
- Quality management planPMI / PMBOKSubsidiary plan within the project management plan describing how quality requirements and targets are put into practice and checked.
- Quality planninggeneralSetting a project's quality objectives and the measures, checks, resources and responsibilities by which they are to be achieved
- Quality practicePRINCE2PRINCE2 7 practice that sets out how quality requirements for the products are defined, checked and evidenced.
- Quality RegisterPRINCE2PRINCE2 register summarizing all planned and completed quality checks on project products, with dates, participants and results.
- Quantitative risk analysisgeneralNumerical assessment of project risks to determine their combined effect on cost, schedule and the probability of success
- Quantitative risk analysisPMI / PMBOKNumerical assessment of how individual risks and other uncertainties together are likely to affect the project's objectives.
R
- RASCIPM²Responsibility matrix in PM² that specifies for each task who performs, is accountable, supports, is consulted or is informed
- Ready for ClosingPM²Third and last PM² Phase Gate at the end of execution, reached when the results have been delivered, accepted and put into use
- Ready for ExecutingPM²Second PM² Phase Gate at the end of planning, at which the Project Steering Committee authorizes implementation of the plans
- Ready for PlanningPM²First PM² Phase Gate at the end of initiation, at which the Business Case and the Project Charter are submitted for approval
- Request for informationgeneralNon-binding request to potential suppliers to gather information on the market, solutions and capabilities before a tender
- Request for proposalgeneralWritten invitation to suppliers to submit a complete proposal with a proposed solution and price for a described task
- Request for quotationgeneralRequest to suppliers for price and delivery terms for precisely specified goods or work
- Requestor SidePM²In PM², the organization that requests a project and receives the solution, represented by Project Owner, Business Manager and Business Implementation Group
- RequirementgeneralDocumented condition or capability that a project result must meet in order to satisfy a stakeholder need
- RequirementPMI / PMBOKProperty or ability a result must have to meet a business need; gathered from stakeholders and traced through to acceptance.
- Residual riskISO 21506Risk that remains once the agreed response actions have been carried out, assessed by likelihood and impact.
- Residual riskPMI / PMBOKThe portion of risk that planned responses do not remove and that is knowingly accepted, recorded and kept under watch.
- ResourcegeneralStaff, equipment, materials, facilities or funds that a project needs to carry out its work and that are planned for it
- Resource breakdown structureISO 21506Hierarchical breakdown of the resources needed in a project by type, such as staff by qualification, equipment and materials.
- Resource breakdown structurePMI / PMBOKTree-like ordering of all resources a project needs, such as staff, material, equipment and services, broken down into finer kinds.
- Resource histogramgeneralColumn chart showing the planned demand for a resource per time period, often compared with the available capacity
- Resource levelingPMI / PMBOKAdjusting start and finish dates so that resource demand matches the available capacity.
- Resource levellinggeneralAdjusting a schedule so that no resource is planned beyond its available capacity
- Resource loadingISO 21506Determining which people, equipment, materials and other means the planned work of an undertaking needs, and when.
- Resource management planPMI / PMBOKSubsidiary plan for dealing with the team and physical resources, from determining needs and acquiring them to tracking their use.
- Resource planninggeneralDetermining which resources a project needs, when and to what extent, and matching this demand against the available capacity
- Responsibility assignment matrixISO 21506Table that records, for each task or result, which role is accountable, carries it out, contributes or is kept informed.
- Responsibility assignment matrixPMI / PMBOKTable that links work packages or tasks to people or groups and shows the role each one plays.
- Retention moneygeneralPart of a payment due that the client withholds until certain conditions are met, as security for performance in line with the contract
- Return on investmentgeneralRatio that relates the profit or benefit of an investment to the capital employed
- ReworkgeneralAction on a defective result that changes it so that it does meet the specified requirements after all
- ReworkPMI / PMBOKFurther work on a faulty result until it meets the specifications; it costs time and money without creating new value.
- RiskISO 21506Possible event that is still uncertain, possibly made up of several events, and that could benefit or harm an undertaking.
- RiskPMI / PMBOKUmbrella term for threats and opportunities: something that may or may not happen and, if it does, affects at least one objective.
- Risk acceptancegeneralDeliberate decision to bear a risk without preventive measures and to accept its consequences should it occur
- Risk acceptancePMI / PMBOKResponse strategy of consciously tolerating a risk and taking no advance measures against or in favor of its occurrence.
- Risk analysisgeneralExamination of identified risks by cause, probability and impact as a basis for priorities and responses
- Risk analysisPMI / PMBOKExamination of identified risks by probability, impact and other characteristics in order to prioritize them and prepare responses.
- Risk appetitegeneralAmount of risk that an organization or sponsor is willing to take on in order to achieve its objectives
- Risk appetitePMI / PMBOKHow much uncertainty an organization or person is willing to bear for the sake of a hoped-for gain; made measurable through risk thresholds.
- Risk assuranceISO 21506Review activities intended to give sponsors reliable evidence that a project or programme can still justify its investment despite its risks.
- Risk avoidancegeneralStrategy that eliminates a risk by removing its cause or changing the undertaking so that the risk cannot arise
- Risk avoidancePMI / PMBOKStrategy against a threat that removes it altogether or shields the project completely from its effects.
- Risk breakdown structureISO 21506Hierarchical breakdown of the threats and opportunities of a project or programme, usually arranged by source of risk.
- Risk breakdown structurePMI / PMBOKLayered classification of conceivable risk sources, e.g. technical, organizational, commercial and external, used as a grid for identifying risks.
- Risk categorygeneralGroup of similar risks, such as technical, organizational, commercial or external, that makes searching and evaluation easier
- Risk categoryPMI / PMBOKGroup for sorting risks with related causes, for example taken from the risk breakdown structure, so that clusters show and responses can be combined.
- Risk contingency reserveISO 21506Time or budget allowance planned for identified risks, to be used only if they materialize.
- Risk identificationgeneralStep in risk management in which the possible risks of a project are sought out, described and recorded
- Risk identificationPMI / PMBOKRecognizing and describing individual project risks and the sources of overall project uncertainty.
- Risk managementgeneralSystematic handling of uncertainty in a project: identifying, assessing, responding to and continuously monitoring risks
- Risk managementPMI / PMBOKSystematic handling of project risks: planning, identifying, analysing, deciding and implementing responses, monitoring.
- Risk Management ApproachPRINCE2PRINCE2 management product defining how risks in the project are identified, assessed, controlled and reported.
- Risk management plangeneralDocument that defines how risk management is organized and carried out in a project
- Risk management planPMI / PMBOKSubsidiary plan setting the methods, roles, budget, rating scales and reporting for risk work on the project, not the risks themselves.
- Risk matrixgeneralGrid that places risks by probability and impact and divides them by colour into low, medium and high risks
- Risk mitigationgeneralStrategy that reduces the probability or the impact of a risk to an acceptable level
- Risk mitigationPMI / PMBOKStrategy against threats that acts early to make their occurrence less likely or their consequences milder, for instance through tests or prototypes.
- Risk practicePRINCE2PRINCE2 7 practice for identifying, assessing and controlling uncertainties that threaten or favour the project’s objectives.
- Risk registergeneralCentral list of all identified risks of a project with their assessment, owners, responses and current status
- Risk registerPMI / PMBOKRecord in which the findings of risk management on individual risks are captured and continually updated.
- Risk RegisterPRINCE2PRINCE2 management product that records all identified threats and opportunities of a project with assessment, responses, owners and status.
- Risk responseISO 21506Defined and documented action taken in relation to an identified risk, ranging from prevention to recovery after the event.
- Risk responsePMI / PMBOKThe strategy and actions chosen by a project to respond to an individual risk or to overall project risk.
- Risk thresholdPMI / PMBOKMeasurable level of risk exposure above which a risk is addressed and below which it may be accepted.
- Risk toleranceISO 21506Limit up to which a project may carry a risk; once the limit is crossed, a defined response has to follow.
- Risk transfergeneralStrategy that shifts the consequences of a risk wholly or partly to a third party, such as an insurer or a contractual partner
- Risk transferencePMI / PMBOKStrategy that hands a threat, together with responsibility for its consequences, to another party outside the project.
- RoadmapgeneralOverview showing which major results, themes or projects are to be tackled in which order over time
- RoadmapPMI / PMBOKOverview on a rough time axis showing what is to be achieved or decided roughly when, without planning individual activities.
- Rolling wave planningISO 21506Planning approach in which near-term stages are planned in detail and later ones only roughly, with detail added step by step.
- Rolling wave planningPMI / PMBOKPlanning in stages: work due soon is detailed now, while later work is sketched roughly and refined as it approaches.
- Root cause analysisgeneralSystematic approach to finding the actual cause of a problem that has occurred, rather than just treating its symptoms
- Root cause analysisPMI / PMBOKAnalysis that looks behind a defect, deviation or risk for its actual trigger instead of only treating the visible symptom.
S
- S-curvegeneralChart of a project's cumulative costs, labour hours or performance over time, usually shaped like an elongated S
- S-curve analysisPMI / PMBOKAnalysis of cumulative cost, hours or work over time, which usually follows an S-shaped curve.
- Schedule bufferISO 21506Reserve of time deliberately placed at chosen points in the schedule so that unexpected delays are cushioned before they hit key dates.
- Schedule compressiongeneralUmbrella term for measures that shorten the planned duration of a project without reducing its scope
- Schedule compressionPMI / PMBOKWays of shortening a schedule's total duration while keeping the agreed scope intact.
- Schedule managementgeneralPlanning, monitoring and controlling all dates of a project so that results are available on time
- Schedule performance indexISO 21506Ratio of earned value to planned value; values below one indicate that the project is behind plan.
- Schedule performance indexPMI / PMBOKEarned value divided by planned value; shows how efficiently the project is progressing compared with its schedule.
- Schedule variancegeneralDifference between the value of the work performed and the value of the work planned; a negative figure means the project is behind plan
- Schedule variancePMI / PMBOKEarned value minus planned value; shows in budget units whether the project is ahead of or behind plan.
- Scope creepgeneralGradual, unapproved expansion of project scope through many small additional requests without adjusting time and budget
- Scope creepPMI / PMBOKGradual, uncontrolled growth of scope through additions that bypass change control, while schedule, budget and resources stay as they were.
- Scrum ArtifactScrumOne of the three work products of Scrum, the Product Backlog, the Sprint Backlog and the Increment, which make work or value transparent
- Scrum EventScrumOne of the five fixed events in Scrum that enable inspection and adaptation: the Sprint and the four events within it
- Scrum GuideScrumFreely available document by Ken Schwaber and Jeff Sutherland that defines Scrum authoritatively; current version from November 2020
- Scrum MasterScrumAccountability in the Scrum Team that establishes Scrum as described in the Scrum Guide and fosters the team's effectiveness
- Scrum TeamScrumSmall, cross-functional and self-managing unit of a Product Owner, a Scrum Master and Developers who pursue one Product Goal together
- Scrum ValuesScrumThe five values of commitment, focus, openness, respect and courage that are meant to guide attitude and collaboration in the Scrum Team
- Secondary riskgeneralNew risk that arises only as a result of implementing a response to another risk
- Secondary riskPMI / PMBOKFollow-on risk that arises only because a risk response is carried out and must be assessed and handled like any other risk.
- Self-managementScrumWorking principle of the Scrum Team, which decides internally who works on what, when and how
- Senior SupplierPRINCE2PRINCE2 role on the Project Board representing those who design and build the products, answerable for their resources and technical integrity.
- Senior UserPRINCE2PRINCE2 role on the Project Board that represents future users, specifies their needs and is answerable for demonstrating the benefits.
- Sensitivity analysisgeneralExamination of how strongly the outcome of a project changes when individual input variables are changed
- Service Level ExpectationKanbanForecast of how long a work item takes from start to finish, given as a period with a probability, such as 90 percent in twelve days
- Shop floor managementLeanLeadership at the place of value creation through short, regular meetings at boards in which metrics, problems and actions are tracked.
- Sigma levelSix SigmaMeasure of how many standard deviations fit between a process mean and the nearest tolerance limit; the higher it is, the fewer defects occur.
- SIPOCSix SigmaHigh-level view of a process with suppliers, inputs, main steps, outputs and customers, usually drawn up at the start of an improvement project.
- Six Sigma project charterfalse friend · PRINCE2Six SigmaShort founding document of a Six Sigma project with problem, measurable goal, benefit, scope, team and timeframe, approved by the champion.
- SMART criteriageneralMnemonic for well-formulated objectives: specific, measurable, achievable, relevant and time-bound
- Soft skillsgeneralPersonal and social skills such as communication, the ability to handle conflict and teamwork that, alongside expertise, determine project success
- Solution ProviderPM²Leadership role on the delivering side in PM² that bears overall accountability for what the project delivers and names the Project Manager
- Special causegeneralIndividual, identifiable influence that changes a process unusually and shows up as an anomaly on the control chart
- Specification limitgeneralUpper or lower limit set by requirements that a characteristic of a product must meet in order to be considered acceptable
- SponsorISO 21506Senior manager who backs a project within the organization, secures resources and takes decisions on fundamental issues.
- SponsorPMI / PMBOKPerson or body that provides a project, program or portfolio with funds and backing, represents it to management and ensures it can succeed.
- SprintScrumFixed-length period of one month or less in which a Scrum Team works towards a Sprint Goal and which contains all other events
- Sprint BacklogScrumThe Developers' plan for the Sprint, consisting of the Sprint Goal, the selected Product Backlog items and the approach to delivering them
- Sprint GoalScrumSingle objective of a Sprint, set in Sprint Planning, that gives the Developers focus without prescribing the exact work
- Sprint PlanningScrumEvent at the start of the Sprint in which the Scrum Team decides what value the Sprint is meant to deliver, what will be done and how it will be done
- Sprint RetrospectiveScrumFinal event of the Sprint in which the Scrum Team reviews how it works and plans improvements to quality and effectiveness
- Sprint ReviewScrumEvent at the end of the Sprint in which the Scrum Team and stakeholders inspect the result and jointly discuss the next steps
- Stage PlanPRINCE2Detailed PRINCE2 plan for a single management stage, used by the project manager to control day-to-day work.
- StakeholderISO 21506Anyone with an interest in an undertaking such as a project, who can influence it or considers themselves affected by it, whether person, group or organization.
- StakeholderPMI / PMBOKAnyone, whether a person, group or organization, who can influence an undertaking or sees themselves affected by its decisions, work or results.
- Stakeholder analysisgeneralSystematic identification and assessment of the people and groups who influence a project or are affected by it
- Stakeholder engagementPMI / PMBOKDeliberate, ongoing involvement of stakeholders to understand their needs, align expectations and gain their support.
- Stakeholder managementgeneralSystematic identification, assessment and involvement of all people and groups who influence a project or are affected by it
- Standardized workLeanDocumented, currently best known way of carrying out a task; the basis for consistent results and for any improvement.
- Start-to-finishPMI / PMBOKRarest type of dependency in a schedule: the successor may only be completed after the predecessor has begun, as with shift handovers.
- Start-to-finish relationshipgeneralRarely used logical relationship in which an activity can finish at the earliest once another activity has started
- Start-to-startPMI / PMBOKType of dependency in which the successor may begin once the predecessor has begun; both can then run in parallel.
- Start-to-start relationshipgeneralLogical relationship in which an activity can start at the earliest once another activity has started
- Starting up a projectPRINCE2PRINCE2 process before the project proper: checks whether an undertaking is worthwhile and prepares the decision to initiate it.
- Statement of workgeneralDocument describing the nature, scope and quality of a service or delivery so that it can be tendered, delivered and verified
- Statement of workPMI / PMBOKWritten account of what a project or contractor is to deliver, especially as the basis for a tender and contract.
- Statistical process controlgeneralMonitoring and controlling an ongoing process by statistical means, mainly control charts, to detect disturbances early and reduce variation.
- Status dategeneralDefined point in time at which the project status is captured and to which the progress, costs and forecasts of a report refer
- Steering committeegeneralHighest decision-making body of a project, which directs the project manager, takes fundamental decisions and resolves conflicts
- Steering committeePMI / PMBOKBoard of executives and key stakeholders that guides an undertaking, makes major decisions and settles conflicts.
- Steering LayerPM²Layer of the PM² project organization that gives a project direction and keeps it aligned with its objectives, embodied in the Project Steering Committee
- Story pointgeneralRelative unit used by agile teams to estimate the size, effort, complexity and uncertainty of items in comparison with one another
- Story pointPMI / PMBOKUnitless measure with which a team estimates the size of user stories relative to one another.
- Strategic alignmentISO 21506State in which the undertakings in a portfolio, through selection and ongoing adjustment, actually serve an organization's strategy.
- SubnetworkgeneralSection of a network schedule that represents a defined part of the project and is linked to the overall network through interfaces
- SubprojectgeneralClearly defined part of a larger project with its own lead and objectives, contributing to the overall project
- Successor activitygeneralActivity that immediately follows another in the sequence and depends on it in time
- Successor activityPMI / PMBOKSchedule activity whose start or finish is tied to a preceding activity through a logical dependency.
- Summary activitygeneralActivity in the schedule that groups several subordinate activities and shows their overall time span and totals
- Summary activityPMI / PMBOKBar in the schedule that bundles a group of related activities and represents them as one.
- Supplier selectiongeneralEvaluation of bids and potential suppliers against defined criteria to determine the most suitable contractual partner
- Support LayerPM²Layer of the PM² project organization for supporting roles, whose extent depends on project size and is decided by the Project Manager
- Sustainability Management ApproachPRINCE2PRINCE2 7 management product defining how the project’s sustainability targets are set, measured and controlled.
- SWOT analysisgeneralAnalysis method that contrasts the strengths and weaknesses of an undertaking with the opportunities and threats in its environment
- SWOT analysisPMI / PMBOKStructured comparison of internal strengths and weaknesses with external opportunities and threats, e.g. to identify risks or assess options.
T
- Tailor to suit the projectPRINCE2PRINCE2 principle: the method is adapted to the size, risk, context and approach of each project without abandoning the principles.
- TailoringPM²In PM², adapting the methodology to an organization's environment and needs, for example by changing roles, process steps or artefacts
- Takt timeLeanAvailable working time divided by customer demand in the same period; sets the rhythm in which one unit must be completed.
- Task orderISO 21506Document by which specific services are actually ordered on the basis of a contract that is already in place.
- Team developmentgeneralMeasures and process through which a group of individuals becomes an effective project team
- Team ground rulesgeneralRules for collaboration, communication and conduct towards one another, agreed jointly by the project team
- Team ManagerPRINCE2PRINCE2 role that leads a team producing products agreed in work packages and reports to the Project Manager.
- Team PlanPRINCE2Optional PRINCE2 plan used by a team manager to plan and control the work on one or more work packages.
- Technical performanceISO 21506Measure of which required functions or capabilities a result has already reached while the work is still under way.
- TenderinggeneralProcedure in which a client invites several suppliers to submit bids for a piece of work on the basis of uniform documents
- Theory of ConstraintsgeneralManagement approach holding that a system's performance is determined by its tightest constraint, on which all improvement should focus
- ThreatISO 21506Possible event that, if it occurs, would impair schedule, cost, quality or other project objectives.
- ThreatPMI / PMBOKRisk with an adverse effect that would endanger schedule, cost, scope or quality and is handled with strategies such as avoidance or mitigation.
- Three-point estimatinggeneralEstimating technique that collects an optimistic, a most likely and a pessimistic value and derives an expected value from them
- ThroughputKanbanFlow metric in Kanban: the count of work items completed in a given period, counted as an exact number of items
- Time and materials contractgeneralContract under which working time is billed at agreed rates and materials according to consumption, with no total price fixed
- Time and materials contractPMI / PMBOKContract type mixing features of fixed-price and cost-reimbursable deals: hours worked are billed at agreed rates, plus materials used.
- Time recordinggeneralRecording the working time that employees spend on projects, work packages or tasks
- Time-phased budgetISO 21506Budget assigned to the periods or phases in which the work is expected to take place and the costs to arise.
- TimeboxPMI / PMBOKPeriod of time fixed in advance for a piece of work and never extended; if needed, the scope is adjusted instead.
- TimeboxinggeneralWay of working in which a task or meeting is given a fixed time frame that is not exceeded
- Tolerance (PRINCE2)PRINCE2In PRINCE2, the permitted deviation above or below a planned target within which a level may decide without referring to the level above.
- TollgateSix SigmaFormal review at the end of each DMAIC phase at which the champion decides whether the Six Sigma project continues, changes course or stops.
- Total cost of ownershipgeneralTotal costs of an acquisition over its useful life, including operation, maintenance, training and disposal
- Total cost of ownershipPMI / PMBOKSum of all costs of a result over its life cycle, from acquisition and operation to decommissioning.
- Total floatgeneralAmount of time by which an activity can be postponed without delaying the project end or a specified end date
- Total floatPMI / PMBOKAn activity's total slack: how far it may be moved or extended before the project end or a fixed date is put at risk.
- Total quality managementgeneralManagement philosophy that makes quality the task of all employees and processes and relies on customer focus and continual improvement
- Toyota Production SystemLeanSystem of production and management developed at Toyota after the Second World War, from which Lean emerged.
- Traditional project managementgeneralPlan-driven approach that fixes a project's objectives, scope and course early and controls delivery against this plan
- Transition PlanPM²PM² plan for moving from the old to the new state, intended to minimize disruption to operations and secure the use of the results
- Trend analysisgeneralEvaluation of how project metrics develop over several reporting dates in order to detect future variances early
- Trend analysisPMI / PMBOKEvaluation of performance data over several reporting periods that infers future development from the direction and pace of change.
V
- V-modelgeneralProcess model that sets a matching test level against each design level, forming the shape of a V
- ValidationgeneralConfirmation, through objective evidence, that a result is suitable for its intended use under real conditions
- ValidationPMI / PMBOKEvidence that a result fulfills its purpose in real use and satisfies customer and stakeholders; usually concluded by formal acceptance.
- Value analysisgeneralSystematic method that examines the functions of a product or undertaking in order to achieve the required benefit at lower cost
- Value streamLeanAll the steps a product or service passes through from order to delivery to the customer, whether they add value or not.
- Value stream mappingLeanTool for depicting the current state of a value stream, with material and information flow, times and inventories, on a single map.
- VarianceISO 21506Gap between the approved baseline and what has actually been achieved, for example in schedule, cost or scope.
- VariancePMI / PMBOKQuantifiable difference between what the baseline or expectation says should apply and the value actually observed.
- Variance analysisgeneralExamination of the differences between planned and actual project values, their causes and their consequences
- Variance analysisPMI / PMBOKExamination of observed deviations from plan: how large they are, where they come from and what they mean for the rest of the project.
- Variance at completionISO 21506Budget at completion minus estimate at completion; shows how far the total cost is expected to depart from the plan.
- Variance at completionPMI / PMBOKExpected budget variance at project end: budget at completion minus estimate at completion.
- Variance thresholdISO 21506Limit for variances, set in advance, that determines when the project manager or the sponsor has to step in.
- VerificationgeneralConfirmation, through objective evidence, that a result fulfils the specified requirements
- VerificationPMI / PMBOKCheck within the project, e.g. by test, measurement or inspection, of whether a result meets the specifications set for it.
- Virtual teamgeneralTeam whose members work in different locations and collaborate mainly through digital channels
- Voice of the CustomerSix SigmaSystematically gathered needs, expectations and complaints of a process’s customers, in their own words, as the starting point for measurable requirements.
W
- Waterfall modelgeneralProcess model in which the phases of a project are passed through strictly in sequence, each building on the completed previous one
- WBS codegeneralUnique, usually hierarchical number assigned to each element of the work breakdown structure
- WBS dictionaryPMI / PMBOKCompanion document to the WBS that explains every element in detail, including its content, dates and responsible party.
- Work authorizationgeneralExplicit approval to start work on a work package or activity, usually combined with a budget and dates
- Work breakdown structureISO 21506Hierarchical decomposition of the entire project scope into ever smaller components, down to the work package.
- Work breakdown structurePMI / PMBOKDeliverable-oriented breakdown of the entire project scope into levels down to work packages that together cover exactly this scope.
- Work breakdown structure dictionaryISO 21506Companion document to the work breakdown structure that records, element by element, content, results, responsibility and other details.
- Work breakdown structure elementISO 21506Any individual building block of the work breakdown structure at a particular level, from the top element down to the work package.
- Work effortgeneralAmount of working time that an activity or work package requires, measured in person-hours or person-days
- Work in ProgressKanbanAll work items that have been started but not yet finished; explicitly limited in Kanban and one of the four flow metrics
- Work itemKanbanIndividual unit of value that moves through the workflow of a Kanban system, such as an order, a request or a feature
- Work Item AgeKanbanFlow metric in Kanban: the time elapsed so far since a work item that has not yet finished was started
- Work packageISO 21506Defined unit of related activities at the lowest level of the work breakdown structure, with its own result, timeframe and budget.
- Work packagePMI / PMBOKSmallest unit in the WBS: a clearly bounded partial result with one owner, for which effort, cost and duration are planned.
- Work PackagePRINCE2In PRINCE2, the agreed transfer of responsibility for delivering specific products from the project manager to a team manager.
- Work package descriptiongeneralDocument that bindingly records the content, results, responsible person, dates, effort and interfaces of a work package
- WorkaroundgeneralUnplanned, usually makeshift solution with which a project reacts to a problem that has occurred and for which nothing was prepared
- WorkaroundPMI / PMBOKUnplanned, short-term fix for a problem that no response was prepared for or for which the prepared response has failed.
To this term: equivalentTo this term: closely relatedTo this term: partially overlappingTo this term: false friend