Programme

Definition

A programme brings together projects, subordinate programmes and other work, which ISO 21506 calls programme components. On their own, these do not deliver the desired benefit; only their coordinated interplay does. A programme pursues a strategic objective, such as digitizing a public administration or restructuring a production network, and often runs for several years. New components can be added along the way and others dropped when circumstances change.

Equivalents in other frameworks

Concept Group of related projects with a shared objective · three frameworks reviewed

Equivalents of Programme in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKProgramequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Programme

Distinction

A project delivers a defined result, a programme an overarching benefit from several results. A portfolio covers all of an organization's undertakings, even those without any connection in content. Programme management is the steering of a programme, the programme itself is its subject. In everyday language, funding schemes or packages of measures are also called programmes without being managed as programmes in the project management sense.

In practice

An energy utility launches a programme to switch to renewable heat. It includes projects for three large heat pumps, a heat storage facility, network adaptation, a new tariff model and an information campaign for customers. None of the projects achieves the objective on its own. The programme manager sets the sequence, moves budget between the projects and measures success by the share of renewable heat in the network.

Frequently asked questions

When is an undertaking a programme?

When several projects depend on each other, are meant to create a benefit together and therefore have to be steered as a whole.

Does a programme have a fixed end?

It is usually limited in time, but less sharply than a project. It ends when the intended benefit has been achieved or the organization abandons the objective.

Source and context

Reference
ISO 21506:2024, 3.54
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Programme. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/programme/

Short form

Hain, D. (n.d.): Programme. PMDecoder, entry on ISO 21506:2024, 3.54. https://pmdecoder.com/en/glossary/programme/ (retrieved 24 November 2026)

BibTeX
@misc{programme,
  author  = {Hain, Dennis},
  title   = {Programme},
  note    = {PMDecoder, ISO 21506:2024, 3.54},
  url     = {https://pmdecoder.com/en/glossary/programme/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/programme/">
  <p>Group of related projects and other work that are steered together in order to achieve an overarching benefit.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/programme/">Programme</a>, PMDecoder, ISO 21506:2024, 3.54</footer>
</blockquote>

Found a mistake? Let us know, we check every report.