DMAIC

Definition

DMAIC is the core Six Sigma approach for projects that aim to improve an existing process. The letters stand for the five phases Define, Measure, Analyze, Improve and Control. First the problem, goal and scope are set; then the current performance of the process is captured with reliable data. From these data the underlying causes of variation and defects are identified before solutions are developed, tested and introduced. The last phase makes sure the improvement lasts and the process does not slip back into its old state. Each phase ends with a review, the tollgate, at which the decision to continue is taken. The approach assumes that the output of the process can be measured.

Equivalents in other frameworks

Concept Defined framework for how a project proceeds · two frameworks reviewed

Equivalents of DMAIC in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKMethodologypartially overlappingSpecial form of a methodology, limited to projects that improve existing processes.
generalProcess modelpartially overlappingSpecial form of a methodology, limited to projects that improve existing processes.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
DMAIC

Distinction

The PDCA cycle describes a general, repeatable learning loop; DMAIC is a project approach run through once, with defined phase results and a strong emphasis on measurement and statistics. For developing new products or processes where nothing can yet be measured, Six Sigma uses Design for Six Sigma instead, with cycles such as DMADV. Unlike a general project methodology, DMAIC is limited to improvement undertakings.

In practice

An insurer takes an average of 19 working days to settle claims. In the Define phase the team sets a target of ten days, then measures the lead time of each processing step and finds in the analysis that missing documents trigger most of the queries. A revised checklist in the claim form is piloted and introduced; a control plan monitors lead time over the following months.

Frequently asked questions

How long does a DMAIC project take?

Often a few months. The duration depends on the scope; topics that are too large are better split into several projects so that results become visible within a manageable time.

Is it allowed to return to an earlier phase?

Yes. If the analysis shows, for example, that the measurement data are insufficient, the measurement is extended. The phases set a sequence but do not rule out going back.

Source and context

Reference
ISO 13053-1:2011
Edition
ISO 13053-1:2011 (DMAIC methodology)
Cite this entry
APA

DMAIC. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/dmaic/

Short form

DMAIC (n.d.). PMDecoder, entry on ISO 13053-1:2011. https://pmdecoder.com/en/glossary/dmaic/ (retrieved 24 November 2026)

BibTeX
@misc{dmaic,
  title   = {DMAIC},
  note    = {PMDecoder, ISO 13053-1:2011},
  url     = {https://pmdecoder.com/en/glossary/dmaic/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/dmaic/">
  <p>Five-step approach for Six Sigma improvement projects on existing processes: Define, Measure, Analyze, Improve and Control.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/dmaic/">DMAIC</a>, PMDecoder, ISO 13053-1:2011</footer>
</blockquote>

Found a mistake? Let us know, we check every report.