Constraint
Definition
In PMI usage, a constraint is a factor that restricts how a project, programme, portfolio or process can be carried out. Constraints can be internal or external: a fixed delivery date, a capped budget, legal requirements, technical standards or the requirement to use a particular platform. PMI speaks of competing constraints because scope, schedule, cost, quality, resources and risk depend on one another: relaxing or tightening one of them changes the others. Constraints are documented together with assumptions and taken into account in decisions.
Equivalents in other frameworks
Concept Fixed limitation on the options available · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Constraint | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Constraint
- Topic area
- Planning and project structure
Distinction
The cross-framework term for a fixed condition that limits room for manoeuvre refers to the same thing. An assumption is an unconfirmed supposition, a constraint a fixed limit. The term shares only the word with the theory of constraints, where it means a bottleneck that determines the throughput of a system.
In practice
An exhibition stand builder is to erect a stand for a trade fair. The opening day is fixed, the hall is only accessible two days beforehand, and the fair’s fire safety regulations prescribe certain materials. These three constraints shape the planning: large parts are pre-assembled in the workshop, and fire safety is checked before price when choosing materials.
Frequently asked questions
Can constraints be negotiated?
Some can, such as budget limits or internal requirements, if it turns out that they jeopardize the objective. Legal requirements or fixed dates set by third parties, on the other hand, usually cannot be changed and have to be met.
What does the expression competing constraints mean?
It describes the fact that scope, time, cost, quality, resources and risk cannot be set independently of one another. If a deadline is brought forward, cost or risk usually rises, or the scope has to be reduced.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Constraint. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/constraint-pmi/
Constraint (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/constraint-pmi/ (retrieved 24 November 2026)
@misc{constraintpmi,
title = {Constraint},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/constraint-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/constraint-pmi/"> <p>Limit or requirement, such as a fixed deadline, a capped budget or a regulation, that narrows the options for carrying out an undertaking.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/constraint-pmi/">Constraint</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.