Lag
Definition
A lag is a waiting time attached to a logical relationship between two activities. It specifies that the successor cannot start or finish immediately but only after a certain time has elapsed. Typical reasons are technical waiting times such as curing or drying, delivery times or prescribed periods. A lag consumes no resources and creates no work. It can be applied to any of the four relationship types and is taken into account in the forward and backward pass.
Equivalents in other frameworks
Concept Waiting time between predecessor and successor · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Lag | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Lag
- Topic area
- Network planning
Distinction
Lag corresponds to the German Nachlaufzeit, also known as a positive time offset. Its counterpart is lead, which brings the successor forward. A waiting time that involves work or cost, such as an inspection by a public authority, can also be planned as a separate activity; this makes it more visible in the plan than a lag.
In practice
After a concrete slab is poured, two weeks must pass before the formwork may be removed. The site manager links “pour slab” and “strip formwork” with finish-to-start and a lag of 14 days. If pouring is postponed, the stripping date moves with it automatically and the waiting time is not forgotten.
Frequently asked questions
Should a lag be expressed in working days or calendar days?
That depends on the reason. Drying time continues over the weekend, whereas a processing period at an authority usually counts only working days. Many tools allow both; what matters is choosing deliberately.
Why are many lags seen as a planning weakness?
Because they can hide reasons. A lag without a recognizable explanation makes the plan hard to follow. Anyone using lags should document their purpose.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Lag. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/lag-pmi/
Lag (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/lag-pmi/ (retrieved 24 November 2026)
@misc{lagpmi,
title = {Lag},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/lag-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/lag-pmi/"> <p>Waiting time built into a schedule link that pushes the start or finish of the successor back relative to its predecessor.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/lag-pmi/">Lag</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.