Design review

Definition

A design review takes place at defined points in development, for example after the concept, after the preliminary design and before release for production. Experts who have not worked on the design themselves check documents, calculations, models or prototypes against the requirements and for risks to manufacture, operation and maintenance. Results are recorded, open points are assigned to responsible persons, and the review is often a prerequisite for approving the next phase.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Classification

this term
Design review
Topic area
Quality

Distinction

Verification demonstrates that requirements have been met; the design review assesses a design before all the evidence is available. A code review in software development is a related, usually more fine-grained check of individual parts of a program. At a gate, the decision is about whether the whole project continues; the design review provides a technical basis for it.

In practice

Before the tooling for a new plastic housing is released, development invites participants to a design review. Besides the design engineers, tool making, production, quality and service take part. Service points out that one screw can only be reached with a special tool after assembly, which makes later repairs more difficult. At this stage the change costs one day of design work; after the injection moulds had been built, it would have cost several tens of thousands of euros.

Frequently asked questions

Who should take part in a design review?

Besides the developers, independent experts and representatives of production, quality, service and, where needed, customers or suppliers.

How many reviews does a development need?

That depends on scope and risk. Two to four formal reviews at the most important transitions are common.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Design review. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/design-review/

Short form

Hain, D. (n.d.): Design review. PMDecoder. https://pmdecoder.com/en/glossary/design-review/ (retrieved 24 November 2026)

BibTeX
@misc{designreview,
  author  = {Hain, Dennis},
  title   = {Design review},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/design-review/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/design-review/">
  <p>Planned, formal assessment of a design by experts to check whether it meets the requirements and to uncover problems early</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/design-review/">Design review</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.