Resource breakdown structure
Definition
In PMI’s understanding, the resource breakdown structure arranges all the resources a project needs in a hierarchy of categories and types. At the top level there might be labour, materials, equipment and services; below them follow finer distinctions such as skills, grades, equipment types or material groups. The structure helps to capture resource needs completely, to aggregate needs across work packages and to analyse costs by resource type. It is developed or refined when estimating resource requirements and updated during the project as new types of resources are added.
Equivalents in other frameworks
Concept Hierarchical breakdown of resources · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Resource breakdown structure | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Resource breakdown structure
- Topic area
- Resources and estimating
Distinction
The resource breakdown structure corresponds to the resource breakdown structure of ISO 21506, which uses the same designation. It differs from the work breakdown structure in its subject: the latter breaks down the work, the former the means by which the work is done. The organizational breakdown structure, by contrast, shows organizational units and their responsibilities, and the risk breakdown structure organizes sources of risk; only the principle of hierarchical decomposition is shared.
In practice
For the construction of a school canteen, the project team sets up a resource breakdown structure with the branches labour, machinery, building materials and subcontracted services. Under labour are foremen, bricklayers and electricians; under machinery are crane, excavator and vibrating plate. When the schedule is compressed, an analysis by this structure shows that in two weeks twice as many electricians are needed as are available. The team then brings in a subcontractor.
Frequently asked questions
How detailed should a resource breakdown structure be?
As detailed as planning and control require. If it is enough to know that electricians are needed, that level suffices; if qualifications such as high-voltage work or fire alarm systems matter, further distinctions are needed.
Does the resource breakdown structure contain named individuals?
Usually not. It describes types of resources. Who is actually assigned is set out in resource assignments and in documents such as the responsibility assignment matrix.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Resource breakdown structure. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/resource-breakdown-structure-pmi/
Resource breakdown structure (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/resource-breakdown-structure-pmi/ (retrieved 24 November 2026)
@misc{resourcebreakdownstructurepmi,
title = {Resource breakdown structure},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/resource-breakdown-structure-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/resource-breakdown-structure-pmi/"> <p>Tree-like ordering of all resources a project needs, such as staff, material, equipment and services, broken down into finer kinds.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/resource-breakdown-structure-pmi/">Resource breakdown structure</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.