Work in Progress
abbr. WIP
Definition
Work in Progress comprises all work items that lie between their start point and their end point in the workflow, that is, items that have been started but are not yet finished. In the Kanban Guide the term has two roles: as a flow metric it is the number of such items, and as an element of the Definition of Workflow there must be a specified way of controlling this amount. The members explicitly limit work in progress and only start new work when the system signals that there is capacity for it. How the limit is shown, for example as a number above a column or for the whole board, is up to them. Permitted exceptions also belong in the Definition of Workflow.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Definition of WorkflowFlow metrics
- this term
- Work in Progress
Distinction
A WIP limit is a common way of limiting work in progress; however, the 2025 Kanban Guide no longer explicitly prescribes this form. In accounting, work in progress denotes unfinished goods held as inventory; the Kanban term has nothing to do with this meaning. Limiting work in progress gives rise to a pull system.
In practice
An editorial team has 23 articles in progress at the same time, and hardly any get finished. It decides that no more than four articles may be in research and three in copy-editing. In the first weeks this feels unfamiliar, because editors wait for free slots and help one another with copy-editing. After two months, articles appear a week earlier on average.
Frequently asked questions
How high should the limit be?
The Kanban Guide gives no figure. Teams often start with a value close to the current amount and lower it step by step while observing throughput and cycle time.
Why should less be started at the same time?
Because many parallel tasks lead to waiting times, context switching and late completion. A limit shifts attention towards finishing work that has already been started.
Source and context
- Reference
- Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow
- Edition
- The Kanban Guide, May 2025
Differences from other editions
- The Kanban Guide, December 2020
- The limit was described as a WIP limit, usually made visible on the Kanban board through figures or a fixed number of places, for instance for one column, several areas or the entire board. Pulling more items than permitted was meant to happen only rarely and by agreement.
Cite this entry
Work in Progress. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/work-in-progress/
Work in Progress (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow. https://pmdecoder.com/en/glossary/work-in-progress/ (retrieved 24 November 2026)
@misc{workinprogress,
title = {Work in Progress},
note = {PMDecoder, Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow},
url = {https://pmdecoder.com/en/glossary/work-in-progress/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/work-in-progress/"> <p>All work items that have been started but not yet finished; explicitly limited in Kanban and one of the four flow metrics</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/work-in-progress/">Work in Progress</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Actively Managing Items in a Workflow</footer> </blockquote>
Found a mistake? Let us know, we check every report.