Scrum Guide

Definition

The Scrum Guide is the authoritative description of Scrum. Ken Schwaber and Jeff Sutherland, who first presented Scrum publicly together in 1995, published the first version in 2010 and have revised it several times since, most recently in November 2020. The Guide sets out the theory and values, the accountabilities in the Scrum Team, the events and the artifacts. It deliberately describes only the essentials; techniques and practices that fit with Scrum are left out. The text is published under the Creative Commons BY-SA 4.0 licence and is available in many languages, including a German translation that keeps central terms in English.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Distinction

Unlike standards or paid handbooks, the Scrum Guide is free and short: the 2020 version runs to only about 13 pages in the original. Many widespread practices such as user stories, story points or burndown charts are not in it. According to the Guide, anyone who uses just some elements of Scrum is not working with Scrum, because the framework only applies as a whole.

In practice

A public authority introduces Scrum in a digitalization project and wants to drop the Sprint Retrospective because the meetings take too much time. The Scrum Master refers to the Scrum Guide, according to which an approach without all the events is not Scrum. The team keeps the Retrospective but limits it to one hour, which is well within the timebox for two-week Sprints.

Frequently asked questions

Which versions of the Scrum Guide exist?

The first version of 2010 was followed by revisions in 2011, 2013, 2016, 2017 and 2020. The November 2020 version is authoritative.

May the Scrum Guide be translated or adapted?

The CC BY-SA 4.0 licence permits sharing and adaptation but requires attribution of the authors and the same licence for adapted versions. At the same time, the authors stress that a modified framework is no longer Scrum.

Source and context

Reference
Scrum Guide 2020, Abschnitt Der Sinn des Scrum Guides
Edition
Scrum Guide 2020
Cite this entry
APA

Hain, D. (n.d.). Scrum Guide. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/scrum-guide/

Short form

Hain, D. (n.d.): Scrum Guide. PMDecoder, entry on Scrum Guide 2020, Abschnitt Der Sinn des Scrum Guides. https://pmdecoder.com/en/glossary/scrum-guide/ (retrieved 24 November 2026)

BibTeX
@misc{scrumguide,
  author  = {Hain, Dennis},
  title   = {Scrum Guide},
  note    = {PMDecoder, Scrum Guide 2020, Abschnitt Der Sinn des Scrum Guides},
  url     = {https://pmdecoder.com/en/glossary/scrum-guide/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/scrum-guide/">
  <p>Freely available document by Ken Schwaber and Jeff Sutherland that defines Scrum authoritatively; current version from November 2020</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/scrum-guide/">Scrum Guide</a>, PMDecoder, Scrum Guide 2020, Abschnitt Der Sinn des Scrum Guides</footer>
</blockquote>

Found a mistake? Let us know, we check every report.