Request for information
abbr. RFI
Definition
With a request for information (Informationsanfrage), a client gains an overview before it defines its requirements. It outlines the undertaking and asks about available solutions, references, company data, typical price ranges and implementation times. The answers help to formulate requirements realistically and to shortlist suitable suppliers for a later tender.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Other terms
Other words for the same thing in English usage. Not to be confused with the equivalents above, which translate between frameworks.
- RFI
- abbreviation
- Market consultation
- related, not equivalent
Classification
- this term
- Request for information
- Topic area
- Contracts and procurement
Distinction
A request for information is not aimed at a contract, whereas a request for quotation and a request for proposal are; it comes before them and prepares them. In the public sector, market consultation before a procurement procedure is permitted, but it must not favour any supplier or anticipate the later procedure.
In practice
A university wants to introduce a system for digital examinations but does not know the available solutions. It publishes a request for information with twelve questions on functions, data protection, operating model and references, to which nine suppliers respond. This shows that the planned requirement of taking an examination on a tablet without a network connection is met by only two systems. The university reconsiders the requirement before going to tender.
Frequently asked questions
Do suppliers have to respond to a request for information?
No. Participation is voluntary, and suppliers decide according to their own interests how fully they respond.
What mistakes are made with requests for information?
Too many or too open questions, missing rules on confidentiality and giving the impression of already asking for binding offers.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Request for information. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/request-for-information/
Hain, D. (n.d.): Request for information. PMDecoder. https://pmdecoder.com/en/glossary/request-for-information/ (retrieved 24 November 2026)
@misc{requestforinformation,
author = {Hain, Dennis},
title = {Request for information},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/request-for-information/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/request-for-information/"> <p>Non-binding request to potential suppliers to gather information on the market, solutions and capabilities before a tender</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/request-for-information/">Request for information</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.