Feasibility study
Definition
A feasibility study clarifies whether an undertaking can be realized at all before significant resources are committed. It examines technical prerequisites, costs and financing, legal and permit-related questions, organizational requirements and risks, often for several options. Its result is a recommendation on whether and in what form the undertaking should be pursued.
Equivalents in other frameworks
Concept Assessment of whether an initiative is feasible · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Feasibility analysis | closely related | denotes the analysis in general, the feasibility study its documented result |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Feasibility study
- Topic area
- Initiating
Distinction
The feasibility study asks whether something is possible, the business case whether it is worthwhile; the two are often prepared together. A preliminary study is usually less comprehensive. For large undertakings, the feasibility study is itself a small project in its own right.
In practice
A municipality wants to heat an open-air swimming pool with solar thermal energy. The feasibility study examines roof areas, heat demand, heritage protection requirements, funding opportunities and operating costs for three options. The result: the roof areas are sufficient for only a partial supply, but a combination with a heat pump is feasible and eligible for funding. Only on this basis does the municipal council approve the planning. The cost of the study is a fraction of what a detailed design that was later rejected would have cost.
Frequently asked questions
Who prepares a feasibility study?
Often external experts or a small internal team covering the necessary disciplines, commissioned by the future sponsor.
How detailed does a feasibility study need to be?
Detailed enough to allow a well-founded decision on how to proceed, without anticipating the later planning.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Feasibility study. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/feasibility-study/
Hain, D. (n.d.): Feasibility study. PMDecoder. https://pmdecoder.com/en/glossary/feasibility-study/ (retrieved 24 November 2026)
@misc{feasibilitystudy,
author = {Hain, Dennis},
title = {Feasibility study},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/feasibility-study/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/feasibility-study/"> <p>Investigation carried out before a project into whether an undertaking is technically, economically, legally and organizationally viable</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/feasibility-study/">Feasibility study</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.