Statistical process control
abbr. SPC
Definition
Statistical process control observes a process continuously on the basis of samples and evaluates the measurements using statistical rules. Its central tool is the control chart, supplemented by process capability studies, measurement system analyses and defined reaction plans. The aim is to distinguish between normal variation from common causes and disturbances from special causes, to intervene in good time when there is a disturbance and to leave the process alone when variation is normal. In this way defects are prevented instead of being sorted out at final inspection. The method goes back to Walter A. Shewhart and was spread by W. Edwards Deming.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- Statistical process control
- Narrower term
- Control chart
- Topic area
- Quality
Distinction
The control chart is the most important tool of statistical process control, not a synonym for it. Quality control in the sense of the project management standards checks results against requirements and also includes inspections without statistical analysis. Final inspection sorts out defective results, whereas statistical process control starts earlier and acts on the process itself.
In practice
A project introduces a new dough divider in a bakery. Before start-up, the project manager specifies that five dough pieces are weighed every hour and entered on a control chart; a reaction plan describes who does what in response to which signal. In the second week the chart shows a slow increase in weights. The shift supervisor finds a dirty sensor, cleans it and adds the cleaning to the maintenance schedule. The procedure remains in operation after the project has ended.
Frequently asked questions
Which processes is statistical process control suited to?
Recurring processes with measurable characteristics, such as manufacturing, laboratories or services with indicators like processing times. In one-off projects it is used mainly when starting up new processes that will continue in operation later.
What belongs in a reaction plan?
Which signals on the control chart trigger a reaction, who is informed, how the process is investigated and what happens to the output produced since the last unremarkable sample.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Statistical process control. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/statistical-process-control/
Hain, D. (n.d.): Statistical process control. PMDecoder. https://pmdecoder.com/en/glossary/statistical-process-control/ (retrieved 24 November 2026)
@misc{statisticalprocesscontrol,
author = {Hain, Dennis},
title = {Statistical process control},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/statistical-process-control/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/statistical-process-control/"> <p>Monitoring and controlling an ongoing process by statistical means, mainly control charts, to detect disturbances early and reduce variation.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/statistical-process-control/">Statistical process control</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.