Mind mapping
Definition
In PMI usage, mind mapping is a technique that brings together ideas gathered earlier, for example in separate brainstorming sessions, in one common map. The display arranges thoughts radially around a central topic and thus shows where participants agree, where they differ and where there are gaps. This often generates new ideas. In projects, mind mapping is used among other things to collect requirements, identify stakeholders, identify risks or structure the scope at a high level.
Equivalents in other frameworks
Concept Graphically organising thoughts around a topic · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Mind map | closely related | denotes the technique, the mind map its result |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Mind mapping
- Topic area
- Working techniques
Distinction
The cross-framework term mind map refers to the form of display; the PMI term emphasizes the technique of consolidating contributions from several people and is therefore only closely related. Brainstorming generates ideas, mind mapping organizes them. A work breakdown structure is a binding hierarchical decomposition of scope; a mind map can prepare it but does not replace it.
In practice
At the start of a project for a customer portal, sales, service and IT collect their wishes separately. In a joint workshop, the business analyst transfers the contributions into a mind map with the branches account, orders, support and data protection. It becomes apparent that only service has thought of a call-back request and nobody of accessibility. Both are recorded as open requirements.
Frequently asked questions
Which tools are suitable for mind mapping?
A whiteboard or paper is enough for small groups. Digital tools make work easier for distributed teams and for transferring the content later into requirement lists or plans.
Where does mind mapping reach its limits?
With very extensive topics the map becomes cluttered. It also represents dependencies between branches poorly; network diagrams or structure charts are better suited for that.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Mind mapping. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/mind-mapping/
Mind mapping (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/mind-mapping/ (retrieved 24 November 2026)
@misc{mindmapping,
title = {Mind mapping},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/mind-mapping/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/mind-mapping/"> <p>Visual technique that arranges collected ideas radially around a central theme, revealing common ground, differences and gaps.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/mind-mapping/">Mind mapping</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.