Percent complete
also: Degree of completion, Percentage of completion
Definition
Percent complete expresses how far a piece of work has progressed. Because progress is often hard to measure, there are various methods: the ratio of completed to planned quantities, fixed steps such as 0, 50 and 100 per cent, weighted interim results within a work package, or the judgement of the person responsible. It is a central quantity in progress measurement and in earned value analysis.
Equivalents in other frameworks
Concept Share of work completed · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Percent complete | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Percent complete
- Topic area
- Monitoring and control
Distinction
Percent complete measures the work performed, not the effort consumed: someone who has spent half the budget is not necessarily half finished. Elapsed time is not a measure of progress either. The German term Fortschrittsgrad is used partly as a synonym and partly for the project as a whole.
In practice
In a road construction project, a contractor has been reporting ninety per cent completion of the asphalt work for weeks. Project control switches to a quantity-based method: what counts as finished is what has been laid and inspected in square metres. The value drops to 72 per cent, but it is reliable. For design work without measurable quantities, by contrast, the rule is that a work package counts as half finished when the draft is submitted and as finished when it is approved.
Frequently asked questions
Why does work often stay at ninety per cent for a long time?
Because progress is estimated by feel and the last steps, such as tests, coordination and corrections, are underestimated.
Which measurement method is best?
That depends on the work. Quantity-based methods are the most objective; fixed steps are simple and prevent inflated interim values.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Percent complete. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/percent-complete/
Hain, D. (n.d.): Percent complete. PMDecoder. https://pmdecoder.com/en/glossary/percent-complete/ (retrieved 24 November 2026)
@misc{percentcomplete,
author = {Hain, Dennis},
title = {Percent complete},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/percent-complete/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/percent-complete/"> <p>Share of the planned work of an activity, work package or project that has been performed by a given date, usually as a percentage</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/percent-complete/">Percent complete</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.