Workaround

Definition

A workaround gets round a problem instead of fixing it at the root straight away. It arises under time pressure when something goes wrong that was not identified as a risk or not provided with a response. Workarounds keep a project going, but often at the expense of quality, cost or later effort. They should be documented and later replaced by a permanent solution.

Equivalents in other frameworks

Concept Unplanned makeshift solution to an occurring problem · three frameworks reviewed

Equivalents of Workaround in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKWorkaroundequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Workaround

Distinction

A contingency plan is planned in advance; a workaround is improvised. In IT, the term also refers to the temporary circumvention of a known software defect until a fix is available. Frequent workarounds indicate that risk identification has gaps.

In practice

Two days before a conference opens, the registration system fails, and the provider cannot help for a week. The team exports the latest participant data to a spreadsheet, prints name badges by mail merge and sets up a paper list at the entrance. The event goes ahead, but admission takes twice as long. In the debrief, a data export before every event is adopted as a standard precaution.

Frequently asked questions

Are workarounds bad?

Not in principle; they often save the day. They become a problem when they remain permanently and nobody fixes the actual cause.

What should be done after a workaround?

Document the cause and the solution, plan a permanent fix and check whether similar risks are missing from the register.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Workaround. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/workaround/

Short form

Hain, D. (n.d.): Workaround. PMDecoder. https://pmdecoder.com/en/glossary/workaround/ (retrieved 24 November 2026)

BibTeX
@misc{workaround,
  author  = {Hain, Dennis},
  title   = {Workaround},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/workaround/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/workaround/">
  <p>Unplanned, usually makeshift solution with which a project reacts to a problem that has occurred and for which nothing was prepared</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/workaround/">Workaround</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.