Workaround
Definition
A workaround gets round a problem instead of fixing it at the root straight away. It arises under time pressure when something goes wrong that was not identified as a risk or not provided with a response. Workarounds keep a project going, but often at the expense of quality, cost or later effort. They should be documented and later replaced by a permanent solution.
Equivalents in other frameworks
Concept Unplanned makeshift solution to an occurring problem · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Workaround | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Workaround
- Topic area
- Risks and opportunities
Distinction
A contingency plan is planned in advance; a workaround is improvised. In IT, the term also refers to the temporary circumvention of a known software defect until a fix is available. Frequent workarounds indicate that risk identification has gaps.
In practice
Two days before a conference opens, the registration system fails, and the provider cannot help for a week. The team exports the latest participant data to a spreadsheet, prints name badges by mail merge and sets up a paper list at the entrance. The event goes ahead, but admission takes twice as long. In the debrief, a data export before every event is adopted as a standard precaution.
Frequently asked questions
Are workarounds bad?
Not in principle; they often save the day. They become a problem when they remain permanently and nobody fixes the actual cause.
What should be done after a workaround?
Document the cause and the solution, plan a permanent fix and check whether similar risks are missing from the register.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Workaround. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/workaround/
Hain, D. (n.d.): Workaround. PMDecoder. https://pmdecoder.com/en/glossary/workaround/ (retrieved 24 November 2026)
@misc{workaround,
author = {Hain, Dennis},
title = {Workaround},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/workaround/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/workaround/"> <p>Unplanned, usually makeshift solution with which a project reacts to a problem that has occurred and for which nothing was prepared</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/workaround/">Workaround</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.