Quality management
abbr. QM
Definition
Quality management covers all management and operational tasks that ensure requirements are reliably met. These include setting quality objectives, quality planning, quality assurance, quality control and continual improvement. In a company it is often organized in a management system in accordance with ISO 9001; in a project it is tailored to the specific undertaking.
Equivalents in other frameworks
Concept Planning, assuring and controlling quality · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PRINCE2 | Quality practice | closely related | Related to the products of a project, divided into quality planning and quality control. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Quality management
- Narrower term
- Quality planning
- Topic area
- Quality
Distinction
An organization's quality management system applies permanently and to all activities; quality management in the project uses its requirements and adds rules of its own. Quality assurance and quality control are parts of it, not synonyms for it. Total quality management extends the approach into a corporate philosophy that involves all employees and processes.
In practice
An engineering consultancy is certified to ISO 9001 and has general rules for checks and approvals. For the design of a new hospital building, the project manager adds rules of the project's own: every drawing is checked by a second specialist designer before it is passed on, fire protection drawings additionally by an external expert, and after each design phase the team evaluates the review findings. Recurring errors are fed into the consultancy's checklists.
Frequently asked questions
Does a project need its own quality management if the company is certified?
The company rules form the basis but are rarely sufficient. Project-specific requirements, checks and responsibilities have to be added.
Who is responsible for quality in the project?
The project manager for the overall result, and every person for the quality of their own work. Quality officers provide support but do not take over the responsibility.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Quality management. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-management/
Hain, D. (n.d.): Quality management. PMDecoder. https://pmdecoder.com/en/glossary/quality-management/ (retrieved 24 November 2026)
@misc{qualitymanagement,
author = {Hain, Dennis},
title = {Quality management},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/quality-management/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/quality-management/"> <p>Coordinated activities with which an organization or project plans, assures, controls and improves the quality of its results</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-management/">Quality management</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.