Autonomation
also: Jidoka
Definition
Autonomation combines automation with human judgement: machines detect deviations themselves and stop, and employees too may and should stop the process when they notice a defect. The defect is corrected where it arises, and its cause is investigated before work continues. Its origin is usually traced to a loom by Sakichi Toyoda that stopped as soon as a thread broke. Alongside just-in-time, autonomation is the second pillar of the Toyota Production System. Because a machine does not have to be watched constantly, one person can look after several machines.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Toyota Production System
- this term
- Autonomation
Distinction
Poka-yoke is a means of preventing or detecting errors; autonomation is the principle of stopping when an error has been detected. Andon is the signal used to indicate such a stop. Items marked as blocked work in Kanban also indicate a disruption, but they do not stop the whole process.
In practice
In a software project, an automated test suite runs with every change. The team agrees: if a test fails, no further change is merged into the shared code base until the defect has been fixed. At first, work stalls more often; after a few weeks, defects occur less frequently because every cause is cleared up at once instead of mixing with other defects.
Frequently asked questions
Doesn’t frequent stopping cost too much time?
In the short term, yes. In the long run it saves time, because defects are not passed on and multiplied and because their causes are removed permanently.
What does the Japanese term jidoka mean?
It is usually rendered as automation with a human touch: the machine detects a defect and stops on its own, so that people only have to intervene when there is a problem.
Source and context
Cite this entry
Autonomation. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/autonomation/
Autonomation (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/autonomation/ (retrieved 24 November 2026)
@misc{autonomation,
title = {Autonomation},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/autonomation/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/autonomation/"> <p>Principle of stopping a process immediately when an error occurs, so that no defective result is passed on and the cause is removed.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/autonomation/">Autonomation</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.