Risk matrix

also: Risk heat map

Definition

A risk matrix has one axis for probability and one for impact, each with several levels. Each risk is entered in the cell that matches its rating. Cells at the top right, meaning likely and severe, are usually marked red and call for responses; cells at the bottom left are green and are often only monitored. The organization itself decides where the colour boundaries lie.

Equivalents in other frameworks

Concept Grid of probability and impact · three frameworks reviewed

Equivalents of Risk matrix in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKProbability and impact matrixequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Risk matrix

Distinction

The risk matrix is a means of presenting the results of qualitative risk analysis, not the analysis itself. The risk register contains all the details of each risk; the matrix shows their distribution at a glance. For opportunities, a mirrored matrix is often used in which high values are desirable.

In practice

An energy company uses a five-by-five matrix for all its projects. For each impact level it is described what that level means for cost, schedule, safety and reputation. A review reveals that one project has placed almost all its risks in the yellow middle area. When asked, the team admits that it was unsure and therefore chose the middle. After a second round, the risks are distributed more realistically.

Frequently asked questions

How many levels should a risk matrix have?

Three by three is common for simple projects and five by five for larger ones. More levels often suggest a precision that the estimates do not have.

What are the weaknesses of the matrix?

It simplifies heavily, ratings remain subjective, and risks with a low probability but catastrophic effect are easily underestimated.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Risk matrix. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-matrix/

Short form

Hain, D. (n.d.): Risk matrix. PMDecoder. https://pmdecoder.com/en/glossary/risk-matrix/ (retrieved 24 November 2026)

BibTeX
@misc{riskmatrix,
  author  = {Hain, Dennis},
  title   = {Risk matrix},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/risk-matrix/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/risk-matrix/">
  <p>Grid that places risks by probability and impact and divides them by colour into low, medium and high risks</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-matrix/">Risk matrix</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.