Sigma level
also: Process sigma
Definition
The sigma level describes the performance of a process in a single number. Sigma, the Greek letter, stands in statistics for the standard deviation, the measure of variation. The sigma level indicates how many times this variation fits between the process mean and the nearest tolerance limit. The smaller the variation relative to the tolerance range, the higher the level and the less often defects occur. The usual conversion from DPMO assumes a long-term shift of 1.5 standard deviations: on that basis about 6,210 DPMO correspond to level 4, around 233 DPMO to level 5 and 3.4 DPMO to level 6.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Distinction
The sigma level and capability indices such as Cp and Cpk rest on the same idea but are calculated and presented differently. The 1.5 shift is a convention, not a law of nature, and is also viewed critically in the literature. Figures from different organizations are therefore only comparable if they were calculated in the same way.
In practice
A call centre measures how many calls are answered only after more than two minutes of waiting. The defect rate gives a sigma level of 2.8. After a project on shift planning the figure rises to 3.6. Management does not set a blanket target of six sigma but a target value derived from customer expectations.
Frequently asked questions
Does every process have to reach six sigma?
No. The appropriate level depends on the consequences of a defect and the cost of improvement. For many administrative processes six sigma would be uneconomic.
Why a shift of exactly 1.5 standard deviations?
The value is based on experience that processes vary more in the long term than in short measurements. It is widespread in Six Sigma as a rule of thumb and is not proven for every process.
Source and context
- Reference
- ISO 13053-1:2011
- Edition
- ISO 13053-1:2011 (DMAIC methodology)
Cite this entry
Sigma level. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/sigma-level/
Sigma level (n.d.). PMDecoder, entry on ISO 13053-1:2011. https://pmdecoder.com/en/glossary/sigma-level/ (retrieved 24 November 2026)
@misc{sigmalevel,
title = {Sigma level},
note = {PMDecoder, ISO 13053-1:2011},
url = {https://pmdecoder.com/en/glossary/sigma-level/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/sigma-level/"> <p>Measure of how many standard deviations fit between a process mean and the nearest tolerance limit; the higher it is, the fewer defects occur.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/sigma-level/">Sigma level</a>, PMDecoder, ISO 13053-1:2011</footer> </blockquote>
Found a mistake? Let us know, we check every report.