Rework

Definition

In PMI terms, rework is the work needed after the fact to make a defective or nonconforming result conform to requirements or specifications. Rework consumes time and money without creating new value and therefore counts among the costs of nonconformance within the cost of quality. PMI stresses that defects become more expensive the later they are discovered. The aim of quality management is therefore to reduce rework through prevention, early inspection and the removal of causes.

Equivalents in other frameworks

Concept Correcting a defective result · one framework reviewed

Equivalents of Rework in other frameworks
FrameworkTerm thereRelationNote
generalReworkequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Rework
Topic area
Quality

Distinction

The term corresponds to the cross-framework concept of rework. A corrective action realigns future project performance with the plan; rework fixes a specific defect in a result. A change made because of new requirements is not rework, because the original result met the requirements that applied at the time.

In practice

At acceptance of a website migration, it turns out that 30 forms do not meet accessibility requirements. The team revises them over two weeks, which had not been planned. A subsequent root cause analysis finds that the requirements had not been built into the form template; the template is updated.

Frequently asked questions

Can rework be avoided entirely?

Hardly. The aim is to keep it as low as possible through prevention and early inspection and to learn from rework that does occur.

Should rework be recorded separately?

Yes, that is advisable. Only when rework effort is visible can quality costs be assessed and improvements justified.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Rework. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/rework-pmi/

Short form

Rework (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/rework-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{reworkpmi,
  title   = {Rework},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/rework-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/rework-pmi/">
  <p>Further work on a faulty result until it meets the specifications; it costs time and money without creating new value.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/rework-pmi/">Rework</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.