Competence element: Requirements, objectives and benefits
Definition
This competence element clarifies why a project is carried out: which objectives are to be achieved, which benefits realized and which expectations of those involved met. These are derived from the needs, expectations and strategic goals of the stakeholders. The ICB describes the ability to establish the link between what stakeholders want and the actual project results. This involves three key competence indicators: building a hierarchy of project objectives, identifying and analysing the needs and requirements of those involved, and weighting and deciding on requirements and acceptance criteria. The English name explicitly includes benefits; the German edition calls the element Anforderungen und Ziele (requirements and objectives).
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Practice
- this term
- Competence element: Requirements, objectives and benefits
Distinction
A project objective is a desired state, a requirement a property that a result must have. The competence element links both with the benefits an organization expects. Which deliverables and work follow from them is covered by the competence element Scope.
In practice
A city administration commissions a project for a new online appointment system. The project manager arranges the objectives in a hierarchy: the overarching objective is shorter waiting times for citizens, below it are fewer phone calls and a more even workload at the counters. In workshops she gathers requirements from the citizens' office, data protection and the senior citizens' advisory council and prioritizes them with the sponsor. The agreed acceptance criterion is that appointments can be booked without registration.
Frequently asked questions
What is a hierarchy of objectives for?
Objectives exist at different levels. A hierarchy shows which sub-objectives contribute to which higher objective and helps to identify contradictions between objectives.
Who decides on acceptance criteria?
Usually the sponsor together with the key stakeholders. The ICB expects the project manager to weight requirements and criteria and to bring about the decision.
Source and context
- Reference
- IPMA ICB 4.0, Abschnitt 4.5.2
- Edition
- IPMA Individual Competence Baseline 4.0
Cite this entry
Competence element: Requirements, objectives and benefits. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-requirements-objectives-and-benefits/
Competence element: Requirements, objectives and benefits (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.2. https://pmdecoder.com/en/glossary/competence-element-requirements-objectives-and-benefits/ (retrieved 24 November 2026)
@misc{competenceelementrequirementsobjectivesandbenefits,
title = {Competence element: Requirements, objectives and benefits},
note = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.2},
url = {https://pmdecoder.com/en/glossary/competence-element-requirements-objectives-and-benefits/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-requirements-objectives-and-benefits/"> <p>ICB 4 practice competence: deriving, structuring and prioritizing a project's objectives, benefits and requirements from stakeholder expectations</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-requirements-objectives-and-benefits/">Competence element: Requirements, objectives and benefits</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.2</footer> </blockquote>
Found a mistake? Let us know, we check every report.