Quality management plan

Definition

In PMI terms, the quality management plan is a component of the project management plan. It sets out how the organization's applicable policies, procedures and guidelines are put into practice on the project so that the quality objectives are met. Typical contents are the relevant quality standards, the project's quality objectives, roles and responsibilities, the deliverables and processes subject to review, planned control and assurance activities, tools used, and how nonconformances and improvements are handled. Its scope and formality depend on the needs of the project.

Equivalents in other frameworks

Concept Setting quality objectives and checks · three frameworks reviewed

Equivalents of Quality management plan in other frameworks
FrameworkTerm thereRelationNote
PRINCE2Quality Management Approachpartially overlappingDefines standards, procedures and responsibilities; the quality criteria of individual products are in the product descriptions.
Six SigmaControl planpartially overlappingSets monitoring and reactions for a running process after the project, not quality assurance of the project results.
generalQuality planningpartially overlappingdenotes the document in which the result of quality planning is recorded

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Quality management plan
Topic area
Quality

Distinction

The quality management plan is the output of what is known across frameworks as quality planning; the term refers to the document, not the activity. It sets rules and standards, whereas quality audit and quality control check compliance and results respectively. Acceptance criteria for individual deliverables are more likely to be held in requirements and scope documents.

In practice

For the construction of a day-care centre, the quality management plan specifies the building regulations and sound insulation values to be met, a site manager responsible for quality inspections, recorded acceptance of each trade, a quality audit after the shell is complete, and a procedure for recording, assigning and tracking defects.

Frequently asked questions

Who prepares the quality management plan?

The project manager is accountable for it and develops it with the team and experts, often supported by the quality department. It is approved as part of the project management plan.

Does the quality management plan have to invent its own standards?

No. It usually draws on existing standards, industry requirements and company policies and describes how they are applied on the specific project.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Quality management plan. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-management-plan/

Short form

Quality management plan (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/quality-management-plan/ (retrieved 24 November 2026)

BibTeX
@misc{qualitymanagementplan,
  title   = {Quality management plan},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/quality-management-plan/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/quality-management-plan/">
  <p>Subsidiary plan within the project management plan describing how quality requirements and targets are put into practice and checked.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-management-plan/">Quality management plan</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.