Competence element: Organisation and information
Definition
This competence element describes how someone defines, establishes and runs the temporary organization of a project. This covers the roles and responsibilities of those involved, the exchange of information within the project, reporting and the creation and filing of documentation. The ICB regards organizational structure and communication channels as inseparably linked. The four key competence indicators range from identifying the stakeholders' needs for information and documentation, through defining structure, roles and responsibilities and setting up infrastructure and information systems, to implementing, monitoring and adjusting the project organization. Information security and regulatory requirements are also part of it.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Practice
- this term
- Competence element: Organisation and information
Distinction
The project organization is the structure itself; the competence element is the ability to shape it. The permanent organization outside the project is covered by the competence element Governance, structures and processes. How someone communicates personally belongs to the competence element Personal communication.
In practice
In a project to merge two hospital pharmacies, the project manager defines at the outset who decides, who advises and who is informed, and records this in a responsibility assignment matrix. He sets up a shared repository with graded access rights, because patient data is involved, and agrees a reporting format every two weeks. After three months, a survey shows that the wards are not hearing enough; he adds a short newsletter.
Frequently asked questions
Why do organization and information belong in one element?
Because an organization only works if information reaches the right roles. The ICB therefore considers structure and communication channels together.
Which tools does the ICB name?
Among others, organizational models, the work breakdown structure as the basis of the project organization, information plans and systems for documents and information.
Source and context
- Reference
- IPMA ICB 4.0, Abschnitt 4.5.5
- Edition
- IPMA Individual Competence Baseline 4.0
Cite this entry
Competence element: Organisation and information. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/competence-element-organisation-and-information/
Competence element: Organisation and information (n.d.). PMDecoder, entry on IPMA ICB 4.0, Abschnitt 4.5.5. https://pmdecoder.com/en/glossary/competence-element-organisation-and-information/ (retrieved 24 November 2026)
@misc{competenceelementorganisationandinformation,
title = {Competence element: Organisation and information},
note = {PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.5},
url = {https://pmdecoder.com/en/glossary/competence-element-organisation-and-information/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/competence-element-organisation-and-information/"> <p>ICB 4 practice competence: setting up and managing the temporary project organization with roles, information flows and documentation</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/competence-element-organisation-and-information/">Competence element: Organisation and information</a>, PMDecoder, IPMA ICB 4.0, Abschnitt 4.5.5</footer> </blockquote>
Found a mistake? Let us know, we check every report.