Resource breakdown structure

Definition

The resource breakdown structure arranges all of a project's resources in a tree structure. The top level contains categories such as staff, machinery, materials and services, with finer groups below, such as electricians, cranes or concrete grades. The breakdown makes it easier to plan requirements, analyse costs by resource type and identify bottlenecks across several work packages.

Equivalents in other frameworks

Concept Hierarchical breakdown of resources · one framework reviewed

Equivalents of Resource breakdown structure in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKResource breakdown structureequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Resource breakdown structure

Distinction

The work breakdown structure breaks down the work, the resource breakdown structure the means used to carry it out. An organization chart shows people and reporting lines, the resource breakdown structure types and qualifications regardless of names. A bill of materials breaks a product down into its components, not the resources used to make it.

In practice

An event technology company is planning a music festival with three stages. The resource breakdown structure divides staff into sound, lighting, rigging and stage construction, each with qualification levels, and equipment into loudspeakers, lighting desks, trusses and generators. The analysis shows that certified riggers are needed on all three stages at the same time and that the company's own pool is not large enough. Two riggers are booked externally at an early stage.

Frequently asked questions

How detailed should the resource breakdown structure be?

As detailed as resources are actually planned and procured differently. Qualifications that can substitute for each other form a single group.

What is it used for in practice?

For requirements and capacity planning, for cost analyses by resource type and as a standard list in planning tools.

Source and context

Reference
ISO 21506:2024, 3.74
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Resource breakdown structure. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/resource-breakdown-structure/

Short form

Hain, D. (n.d.): Resource breakdown structure. PMDecoder, entry on ISO 21506:2024, 3.74. https://pmdecoder.com/en/glossary/resource-breakdown-structure/ (retrieved 24 November 2026)

BibTeX
@misc{resourcebreakdownstructure,
  author  = {Hain, Dennis},
  title   = {Resource breakdown structure},
  note    = {PMDecoder, ISO 21506:2024, 3.74},
  url     = {https://pmdecoder.com/en/glossary/resource-breakdown-structure/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/resource-breakdown-structure/">
  <p>Hierarchical breakdown of the resources needed in a project by type, such as staff by qualification, equipment and materials.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/resource-breakdown-structure/">Resource breakdown structure</a>, PMDecoder, ISO 21506:2024, 3.74</footer>
</blockquote>

Found a mistake? Let us know, we check every report.