Throughput
also: Delivery rate
Definition
Throughput is one of the four flow metrics of the Kanban Guide. It indicates how many work items were completed in a unit of time, for example per day, week or month. The exact number of items is counted, without weighting by size or effort. What counts as completed is determined by the end point in the Definition of Workflow. Forecasts can be derived from the history of throughput, for example how many items are likely to be finished by a given date, often using simulations based on past values. If throughput fluctuates strongly, this points to problems in the workflow, such as large differences between items or frequent blockers.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- Broader term
- Flow metrics
- this term
- Throughput
Distinction
The velocity of many Scrum Teams adds up estimated story points, whereas throughput counts finished items. In the theory of constraints, throughput denotes the rate at which a system generates money through sales; the Kanban term is narrower. The number of items in progress at the same time is measured by the Work in Progress metric.
In practice
A team processing applications for parental allowance (Elterngeld) has decided between 55 and 80 applications per week over the past twelve weeks. When the head of the authority asks whether a backlog of 400 applications can be cleared by the end of the month, the team lead uses the previous weekly figures to calculate several possible outcomes. In most of them, the time is not enough; she proposes requesting support from another unit for two weeks.
Frequently asked questions
Why are items not weighted by size?
The Kanban Guide requires the exact number. In practice, differences in size often even out over many items, and counting saves the effort of estimating.
Which time period is suitable?
One that matches the rhythm of the work. Teams with many small items often measure daily or weekly, teams with few large items rather monthly.
Source and context
- Reference
- Kanban Guide 2025.5, Abschnitt Flow Metrics
- Edition
- The Kanban Guide, May 2025
Cite this entry
Throughput. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/throughput/
Throughput (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Flow Metrics. https://pmdecoder.com/en/glossary/throughput/ (retrieved 24 November 2026)
@misc{throughput,
title = {Throughput},
note = {PMDecoder, Kanban Guide 2025.5, Abschnitt Flow Metrics},
url = {https://pmdecoder.com/en/glossary/throughput/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/throughput/"> <p>Flow metric in Kanban: the count of work items completed in a given period, counted as an exact number of items</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/throughput/">Throughput</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Flow Metrics</footer> </blockquote>
Found a mistake? Let us know, we check every report.