Co-location

Definition

Co-location means that the members of a project team work in the same place for the duration of the project or for important stages, usually in a shared room or office area. Short distances are intended to speed up queries, encourage informal exchange and strengthen cohesion. The measure can apply permanently or be limited to intensive phases such as planning, integration or commissioning.

Equivalents in other frameworks

Concept Shared workplace of a project team · one framework reviewed

Equivalents of Co-location in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKColocationequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Co-location

Distinction

The counterpart is the virtual team, which works spread across locations. A project room is the physical means, co-location the organizational principle behind it. The term has nothing in common with colocation in data centre operations, that is, housing one's own servers in third-party data centres.

In practice

For the critical phase of a plant relocation, a food manufacturer brings logistics, production, maintenance and IT together on one office floor at the new site for eight weeks. Questions that previously went back and forth by e-mail for days are now settled in minutes at a standing table. After the move, those involved return to their usual workplaces but keep the daily short meeting by video.

Frequently asked questions

Is co-location worthwhile despite good video technology?

For phases with many dependencies and high time pressure, often yes, because spontaneous clarifications are faster. For calmer phases, distributed collaboration is usually sufficient.

What does co-location cost?

Besides space and equipment, above all travel and accommodation costs, as well as the burden on staff who leave their usual place of work.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Co-location. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/co-location/

Short form

Hain, D. (n.d.): Co-location. PMDecoder. https://pmdecoder.com/en/glossary/co-location/ (retrieved 24 November 2026)

BibTeX
@misc{colocation,
  author  = {Hain, Dennis},
  title   = {Co-location},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/co-location/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/co-location/">
  <p>Bringing a project team together physically at a shared workplace to improve coordination and cohesion</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/co-location/">Co-location</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.