Kanban system
Definition
According to the Kanban Guide, a Kanban system is the concrete application of the three Kanban practices: defining and visualizing the workflow, actively managing the work within it, and improving the workflow. The Guide understands Kanban as a strategy that seeks to improve how value flows through a process, and it uses Kanban and Kanban system as collective terms for all the concepts it describes, with reference to knowledge work. A Kanban system does not consist of fixed roles or meetings but of the shared Definition of Workflow, the work items, the limiting of work in progress, explicit policies, a Service Level Expectation and the four flow metrics. It can be used in almost any workflow and at any scale.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- Kanban system
- Narrower terms
- Flow metricsKanban practicesKanban system member
Distinction
A Kanban board is only the visualization of a Kanban system. In manufacturing, Kanban system originally refers to controlling the replenishment of materials with cards, as known from the Toyota Production System. With its Kanban Method, Kanban University describes a broader approach with principles and additional practices.
In practice
A legal department reviews contracts for the sales team. It specifies that a review starts when the complete draft contract is received and ends with its approval, maps the states in between on a board, allows no more than six reviews at the same time and measures how long contracts take. After two months, the data shows that queries back to sales take up most of the time; the department introduces a checklist for submitted drafts.
Frequently asked questions
Does a Kanban system need special roles?
No. The Kanban Guide does not prescribe any roles. It speaks of members of the Kanban system, meaning everyone involved in delivering value.
Can a Scrum Team use a Kanban system?
Yes. The Kanban Guide envisages combining Kanban with other value-oriented approaches. There is also a separate Kanban Guide for Scrum Teams.
Source and context
- Reference
- Kanban Guide 2025.5, Abschnitt Definition of Kanban
- Edition
- The Kanban Guide, May 2025
Differences from other editions
- The Kanban Guide, December 2020
- The definition of Kanban explicitly referred to a visual system based on pull, and the guide called its practices and measures immutable: anyone who adopted only some of them was, in the guide’s view, not doing Kanban. Neither statement appears in the 2025 version.
Cite this entry
Kanban system. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/kanban-system/
Kanban system (n.d.). PMDecoder, entry on Kanban Guide 2025.5, Abschnitt Definition of Kanban. https://pmdecoder.com/en/glossary/kanban-system/ (retrieved 24 November 2026)
@misc{kanbansystem,
title = {Kanban system},
note = {PMDecoder, Kanban Guide 2025.5, Abschnitt Definition of Kanban},
url = {https://pmdecoder.com/en/glossary/kanban-system/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/kanban-system/"> <p>The Kanban practices as applied in a specific work environment: a defined and visible workflow, actively managed work and continuous improvement</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/kanban-system/">Kanban system</a>, PMDecoder, Kanban Guide 2025.5, Abschnitt Definition of Kanban</footer> </blockquote>
Found a mistake? Let us know, we check every report.