Decision tree analysis

Definition

In PMI usage, decision tree analysis is a technique for choosing between several alternatives when their outcomes depend on uncertain events. The tree starts with a decision node from which the alternatives branch out. Each branch is followed by chance nodes with the possible events, their probabilities and their financial or time consequences. Costs and returns are totalled for each path; working from right to left, the expected monetary value is then calculated for each chance node. According to this logic, the alternative with the most favourable expected value is the best. PMI assigns the technique to quantitative analysis in risk management, but it is also suitable for other decisions under uncertainty.

Equivalents in other frameworks

Concept Evaluating decisions under uncertainty as a tree · three frameworks reviewed

Equivalents of Decision tree analysis in other frameworks
FrameworkTerm thereRelationNote
generalDecision tree analysisequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Decision tree analysis

Distinction

The PMI name means the same as the cross-framework term Entscheidungsbaumanalyse. Expected monetary value is the measure used to evaluate the tree, not the technique itself. A Monte Carlo simulation, by contrast, considers many uncertainties at once and produces distributions rather than one expected value per alternative.

In practice

A manufacturer must decide whether to carry out a preliminary certification costing 40,000 euros for a new device. Without the preliminary check, experts estimate a 30 percent probability of failing approval, which would cost 250,000 euros in rework. With the check, the probability drops to five percent. The decision tree yields expected costs of 75,000 euros without and 52,500 euros with the check; the team recommends the check.

Frequently asked questions

Where do the probabilities in the decision tree come from?

From historical data where available, otherwise from structured expert estimates. Because the result depends heavily on them, it is worth checking at which probability the recommendation changes.

Does decision tree analysis take risk appetite into account?

Not in its simple form, because it only compares expected values. An organization that wants to avoid large losses at all costs may choose the safer alternative despite a worse expected value. This should then be justified explicitly.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Decision tree analysis. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/decision-tree-analysis-pmi/

Short form

Decision tree analysis (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/decision-tree-analysis-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{decisiontreeanalysispmi,
  title   = {Decision tree analysis},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/decision-tree-analysis-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/decision-tree-analysis-pmi/">
  <p>Graphical calculation method that lays out decision alternatives and their uncertain consequences as branches and evaluates them.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/decision-tree-analysis-pmi/">Decision tree analysis</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.