Project schedule network diagram

Definition

The project schedule network diagram shows the activities of a project and their logical relationships as a connected network. It makes visible the order in which the work must be performed, which activities can run in parallel and where paths converge. Today it is almost always created with the precedence diagramming method, with activities as nodes and relationships as arrows. Depending on the purpose, the nodes contain only the activity name or also duration, early and late dates and float. The diagram can show the whole project or a part of it.

Equivalents in other frameworks

Concept Diagram of activities and their dependencies · three frameworks reviewed

Equivalents of Project schedule network diagram in other frameworks
FrameworkTerm thereRelationNote
ISO 21506Network scheduleequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project schedule network diagram

Distinction

The project schedule network diagram corresponds to the network schedule (Netzplan) in ISO 21506. A Gantt chart, by contrast, shows activities as bars on a time axis, with dependencies drawn in only as a supplement. The project schedule is the broader output of scheduling, which can be presented in various forms, including as a network diagram.

In practice

Before a project to merge two municipal utilities begins, the project manager prints the project schedule network diagram on a large poster. In a workshop, the sub-project leads walk through the arrows and find two missing dependencies: the tariff changeover needs the completed customer database, and the works agreement must be in place before the duty rosters are changed.

Frequently asked questions

When is a network diagram better than a bar chart?

When dependencies are the focus, for example when building or reviewing the schedule logic. For the question of what happens when, a bar chart is usually easier to read.

Must the network diagram show all activities?

No. For meetings, a condensed network with summary activities or milestones is often enough. The complete logic remains stored in the scheduling tool.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Project schedule network diagram. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-schedule-network-diagram/

Short form

Project schedule network diagram (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/project-schedule-network-diagram/ (retrieved 24 November 2026)

BibTeX
@misc{projectschedulenetworkdiagram,
  title   = {Project schedule network diagram},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/project-schedule-network-diagram/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-schedule-network-diagram/">
  <p>Diagram that shows a project's activities and the dependencies between them in their logical order.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-schedule-network-diagram/">Project schedule network diagram</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.