Risk avoidance
Definition
With risk avoidance, the situation from which a risk arises is not entered into at all. This can mean replacing an unproven technology with a proven one, not engaging an unreliable supplier, dropping a particularly exposed part of the scope or scheduling work so that a hazard does not occur. The probability of the risk thus falls to zero.
Equivalents in other frameworks
Concept Eliminating a risk · three frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Risk avoidance | equivalent | — |
| Scrum | — | no counterpart | — |
| Kanban | — | no counterpart | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Risk avoidance
- Topic area
- Risks and opportunities
Distinction
Risk mitigation lowers probability or impact but leaves the risk in place; avoidance removes it. Risk transfer shifts the consequences to third parties. Avoidance often comes at a price: anyone who forgoes a new technology usually forgoes its advantages as well.
In practice
An organizer is planning an open-air concert in October. The greatest threat is bad weather, which would lead to cancellation and refunds. Instead of an expensive roof structure, the organizer moves the event to an exhibition hall. The weather risk disappears completely, but the rental costs rise and the special atmosphere of an open-air event is lost. The organizer explicitly weighs up these disadvantages before deciding.
Frequently asked questions
Is avoidance always the best strategy?
No. It is safe, but it can be expensive or reduce the benefit of the project. Mitigation is often more economical.
Which risks should be avoided?
Above all those with severe, unacceptable consequences, for example for safety, health or the survival of the company.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Risk avoidance. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-avoidance/
Hain, D. (n.d.): Risk avoidance. PMDecoder. https://pmdecoder.com/en/glossary/risk-avoidance/ (retrieved 24 November 2026)
@misc{riskavoidance,
author = {Hain, Dennis},
title = {Risk avoidance},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/risk-avoidance/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/risk-avoidance/"> <p>Strategy that eliminates a risk by removing its cause or changing the undertaking so that the risk cannot arise</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-avoidance/">Risk avoidance</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.