Preventive action
Definition
In PMI usage, a preventive action is a deliberate measure meant to keep project work performance in line with the project management plan from now on. It is taken before a variance has occurred, for example when trends, leading indicators or observations in the team suggest that an objective might be missed. Where preventive actions affect scope, schedule, cost or agreed ways of working, they are raised as change requests and handled through change control. Afterwards, the project checks whether they have had the expected effect.
Equivalents in other frameworks
Concept Action against a potential deviation · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| ISO 21506 | Preventive action | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Preventive action
- Topic area
- Monitoring and control
Distinction
The term corresponds to the ISO 21506 term preventive action. A corrective action responds to a variance that has already occurred, a preventive action to one that is looming. It differs from a risk response in its trigger: a risk response is planned for an identified risk, while a preventive action usually arises from ongoing performance monitoring. In practice, however, the boundary is fluid.
In practice
In a project to introduce new accounting software, analysis of the last three weeks shows that the number of open test defects is falling more slowly than planned. The project is still on schedule. As a preventive measure, the project manager requests two experienced testers from the business unit for four weeks. The request is approved, and in the following weeks the team tracks whether the defect curve returns to plan.
Frequently asked questions
Does every preventive action need a change request?
Not every minor adjustment within the project manager's authority. As soon as baselines, budget or agreed ways of working are affected, however, it is meant to go through change control.
How do you recognize the need for a preventive action?
From trends in performance data, such as indicators declining over several reporting periods, from early warning indicators or from signals within the team before the variance shows up in the figures.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Preventive action. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/preventive-action-pmi/
Preventive action (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/preventive-action-pmi/ (retrieved 24 November 2026)
@misc{preventiveactionpmi,
title = {Preventive action},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/preventive-action-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/preventive-action-pmi/"> <p>Step taken ahead of time so that upcoming project work does not drift away from what the project management plan intends.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/preventive-action-pmi/">Preventive action</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.