Quality assurance
abbr. QA
Definition
Quality assurance looks at how work is done: are the defined processes, standards and checks being followed, and are they suitable for producing the desired result? Typical means are audits, process reviews, training, approval procedures and the evaluation of quality data. The aim is to prevent defects from arising in the first place and to be able to show clients that work is being done carefully.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- Quality assurance
- Topic area
- Quality
Distinction
Quality control checks individual results and identifies deviations, while quality assurance looks at the processes that lead to these results. In everyday language, quality assurance is often used for any kind of checking, including final inspections, which is imprecise from a professional point of view. In software development the term often also covers testing.
In practice
A construction company finds that waterproofing is being done incorrectly on several sites. Rather than simply adding more final inspections, its quality assurance team carries out a process audit. This reveals that subcontractors are using outdated work instructions and that interim inspections before backfilling are often skipped. The company updates the instructions, trains the site supervisors and makes the interim inspection a prerequisite for the next step of work.
Frequently asked questions
Who carries out quality assurance on a project?
Often a function independent of the project team, such as a quality officer or an audit team, so that deviations can be raised openly.
Why is quality assurance worthwhile?
Because defects avoided through better processes cause no inspection or rework costs, and because it strengthens the client's confidence.
Source and context
- Reference
- ISO 21506:2024, 3.70
- Edition
- ISO 21506:2024
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Quality assurance. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/quality-assurance/
Hain, D. (n.d.): Quality assurance. PMDecoder, entry on ISO 21506:2024, 3.70. https://pmdecoder.com/en/glossary/quality-assurance/ (retrieved 24 November 2026)
@misc{qualityassurance,
author = {Hain, Dennis},
title = {Quality assurance},
note = {PMDecoder, ISO 21506:2024, 3.70},
url = {https://pmdecoder.com/en/glossary/quality-assurance/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/quality-assurance/"> <p>Part of quality management that builds confidence, through planned and verified ways of working, that quality requirements will be met.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/quality-assurance/">Quality assurance</a>, PMDecoder, ISO 21506:2024, 3.70</footer> </blockquote>
Found a mistake? Let us know, we check every report.