Variance analysis

Definition

In PMI usage, variance analysis is a technique for establishing why and by how much actual performance differs from the baseline. It answers three questions: how large is the variance, where does it come from, and what does it mean for the rest of the project? It draws on performance measurement indicators such as schedule variance and cost variance, but also on variances in scope, quality or resources. The result is an explanation of the variance and a recommendation on whether and how to respond.

Equivalents in other frameworks

Concept Examining plan-versus-actual differences · one framework reviewed

Equivalents of Variance analysis in other frameworks
FrameworkTerm thereRelationNote
generalVariance analysisequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Variance analysis

Distinction

The term corresponds to the cross-framework term variance analysis. The variance is the measurement result, variance analysis its investigation. Root cause analysis goes deeper and looks for the underlying cause of a problem; it can be part of a variance analysis. Trend analysis looks at development across several status dates instead of the variance at one point in time.

In practice

In the monthly report of an infrastructure project, the cost variance is minus 6 percent and therefore above the 5 percent threshold. Variance analysis breaks the variance down by control account: two thirds come from higher steel prices, one third from rework on a bridge bearing. A change request is raised for the price increase, and a corrective action in quality assurance is agreed for the rework.

Frequently asked questions

Does every variance have to be analysed?

Usually only variances that exceed defined thresholds. This focuses effort on what matters. Thresholds are set during planning, often graded by level.

What belongs in the result of a variance analysis?

The size of the variance, its causes, the likely consequences for schedule and cost, and a recommendation for action or the reasons why none is needed.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Variance analysis. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/variance-analysis-pmi/

Short form

Variance analysis (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/variance-analysis-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{varianceanalysispmi,
  title   = {Variance analysis},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/variance-analysis-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/variance-analysis-pmi/">
  <p>Examination of observed deviations from plan: how large they are, where they come from and what they mean for the rest of the project.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/variance-analysis-pmi/">Variance analysis</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.