Root cause analysis
Definition
In PMI terms, root cause analysis is an analytical technique for finding the fundamental reason behind a variance, a defect or a risk. Instead of merely treating the visible symptom, it asks what ultimately caused it. One cause may underlie several problems; removing it often prevents a whole series of follow-on defects. Common aids are repeatedly asking why, cause-and-effect diagrams, Pareto analysis and fault tree analysis. PMI uses the technique in quality management as well as when looking for sources of risk and when evaluating variances.
Equivalents in other frameworks
Concept Finding the underlying cause of a problem · two frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Root cause analysis | equivalent | — |
| general | 5 Whys | partially overlapping | A single tool of root cause analysis, not the whole approach. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
All designations of this concept side by side
Comparisons
Classification
- this term
- Root cause analysis
- Topic area
- Quality
Distinction
The term corresponds to the cross-framework concept of root cause analysis. It describes the investigation, not the remedy: corrective or preventive actions are derived from its result. Variance analysis establishes the size and direction of a deviation; root cause analysis asks why it occurred.
In practice
In a data centre project, server installations fail repeatedly. The team asks “why” five times and ends up not at operator error but at an outdated installation guide that nobody owns. The guide is given an owner and is reviewed with every software change. Failures drop significantly.
Frequently asked questions
Is there always exactly one root cause?
No. Several causes often act together. The analysis should find the significant ones rather than forcing a single cause.
When is a root cause analysis worthwhile?
For recurring or serious problems. For one-off minor issues the effort is usually too high.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Root cause analysis. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/
Root cause analysis (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/ (retrieved 24 November 2026)
@misc{rootcauseanalysispmi,
title = {Root cause analysis},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/"> <p>Analysis that looks behind a defect, deviation or risk for its actual trigger instead of only treating the visible symptom.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/root-cause-analysis-pmi/">Root cause analysis</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.