Critical to Quality
abbr. CTQ
Definition
A critical-to-quality characteristic, CTQ for short, is a measurable characteristic by which customers judge the quality of a result. It is created by making general customer statements from the Voice of the Customer progressively more concrete, often in a tree running from need through drivers to characteristic. Each CTQ has a precise measurement rule, a target value and limits beyond which a result counts as a defect. CTQs determine what is measured in a Six Sigma project and form the basis for measures such as defect rate, DPMO or sigma level. A project usually concentrates on a few CTQs.
Equivalents in other frameworks
Concept Condition a result must meet · two frameworks reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| PMI / PMBOK | Requirement | partially overlapping | Special form: only the requirements that are decisive for customers, stated measurably with target value and limits. |
| general | Requirement | partially overlapping | Special form: only the requirements that are decisive for customers, stated measurably with target value and limits. |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Critical to Quality
- Topic area
- Scope and requirements
Distinction
Every CTQ is a requirement, but not every requirement is a CTQ: only characteristics that matter most to customers and are stated in measurable form qualify. The Voice of the Customer is the preceding stage in the customers’ own words. The specification limits of a CTQ reflect the customer view and must be distinguished from the control limits of a control chart.
In practice
Customers of a delivery service for medical practices say they need their orders “on time”. The team asks further and learns that supplies must arrive before surgery hours begin. The CTQ is therefore: delivery by 7:30 a.m. on the following day, measured by the handover time stamp; any later delivery counts as a defect.
Frequently asked questions
How many CTQs should a project have?
As few as possible, often one or two. More characteristics spread attention and make it harder to show that an improvement has been achieved.
Who sets the limits of a CTQ?
They are derived from customer expectations and agreed with customers, not from what the process can deliver today.
Source and context
- Reference
- ISO 13053-2:2011
- Edition
- ISO 13053-2:2011 (tools and techniques)
Cite this entry
Critical to Quality. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/critical-to-quality/
Critical to Quality (n.d.). PMDecoder, entry on ISO 13053-2:2011. https://pmdecoder.com/en/glossary/critical-to-quality/ (retrieved 24 November 2026)
@misc{criticaltoquality,
title = {Critical to Quality},
note = {PMDecoder, ISO 13053-2:2011},
url = {https://pmdecoder.com/en/glossary/critical-to-quality/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/critical-to-quality/"> <p>Measurable characteristic of a product or process that is decisive for quality from the customer’s point of view, with target value and limits.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/critical-to-quality/">Critical to Quality</a>, PMDecoder, ISO 13053-2:2011</footer> </blockquote>
Found a mistake? Let us know, we check every report.