Assumption

Definition

In PMI usage, an assumption is something taken as given during planning and treated as true, real or certain even though it has not been proven. Estimates, schedules and budgets always rest on such assumptions, for example about the availability of staff, delivery times or decisions by third parties. PMI recommends recording assumptions explicitly, usually together with constraints in a dedicated log, and reviewing them regularly as the project progresses. If an assumption turns out to be false, the plans that build on it have to be adjusted.

Equivalents in other frameworks

Concept Circumstance assumed true for planning · one framework reviewed

Equivalents of Assumption in other frameworks
FrameworkTerm thereRelationNote
generalPlanning assumptionequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Assumption

Distinction

The cross-framework term planning assumption refers to the same thing. A constraint is a fixed condition, whereas an assumption is an unconfirmed supposition. Every assumption contains uncertainty and is therefore a potential source of risk; an assumption that proves doubtful is often transferred to the risk register.

In practice

A team is planning the introduction of a new point-of-sale system in twenty branches. The schedule assumes that each branch can be closed on a Monday and that the manufacturer delivers the devices four weeks after ordering. Both points are listed as assumptions in the log. When the manufacturer reports supply shortages, the project manager reviews the assumption immediately and postpones the last five branches by a month.

Frequently asked questions

Why should assumptions be documented?

Unstated assumptions only come to light when they prove false. Once written down, they can be checked, agreed with stakeholders and followed up specifically when deviations occur.

How often are assumptions reviewed?

Regularly, for example at every plan update or at the end of a phase, and whenever the environment changes noticeably. Confirmed assumptions are marked as resolved.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Assumption. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/assumption/

Short form

Assumption (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/assumption/ (retrieved 24 November 2026)

BibTeX
@misc{assumption,
  title   = {Assumption},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/assumption/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/assumption/">
  <p>In PMI usage, something the planning treats as given even though it has not yet been confirmed or proven.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/assumption/">Assumption</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.