Trend analysis
Definition
In PMI usage, trend analysis is an analytical technique that uses mathematical or statistical models to forecast future developments on the basis of past results. In a project, performance data are examined over several reporting periods, for example earned value indicators, defect counts, throughput or resource consumption. What matters is not the individual value but the direction and speed of change. This shows whether a situation is improving or deteriorating long before an objective is missed. The results feed into forecasts and into decisions on corrective or preventive actions.
Equivalents in other frameworks
Concept Evaluating development across several data dates · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Trend analysis | equivalent | — |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Trend analysis
- Topic area
- Monitoring and control
Distinction
The term corresponds to the cross-framework term trend analysis; milestone and cost trend analysis are specific forms of it. Variance analysis looks at the variance at a status date and asks about causes, whereas trend analysis looks at development over time. A forecast is the result to which trend analysis can contribute.
In practice
In a software project, the cost performance index falls from 1.02 to 0.91 over four months. Each individual value is still within the agreed tolerance, but trend analysis shows a steady decline. If it continues, the tolerance will be exceeded in two months. The project manager investigates the cause, finds increasing effort for unplanned interfaces and raises a preventive action.
Frequently asked questions
How many data points does trend analysis need?
At least three, preferably more, so that a direction can be distinguished from random fluctuation. The data points should be determined using the same method; otherwise spurious trends arise.
Can a trend simply be extrapolated linearly?
For short periods this is often sufficient. Over longer periods, however, conditions change, for example through learning curves or new project phases, and a reasoned judgement is needed.
Source and context
- Reference
- PMI Lexicon of Project Management Terms 4.0 (2024)
- Edition
- PMBOK Guide – Eighth Edition
Cite this entry
Trend analysis. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/trend-analysis-pmi/
Trend analysis (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/trend-analysis-pmi/ (retrieved 24 November 2026)
@misc{trendanalysispmi,
title = {Trend analysis},
note = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
url = {https://pmdecoder.com/en/glossary/trend-analysis-pmi/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/trend-analysis-pmi/"> <p>Evaluation of performance data over several reporting periods that infers future development from the direction and pace of change.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/trend-analysis-pmi/">Trend analysis</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer> </blockquote>
Found a mistake? Let us know, we check every report.