Project Stakeholder Matrix
Definition
In PM², the Project Stakeholder Matrix records all relevant people and groups involved in a project, together with contact details, and makes clear which role each of them has. It can also classify the stakeholders, for example by influence or by how strongly they are affected. The PM² template arranges the standard roles in groups: bodies such as the Project Steering Committee, roles such as the Project Owner or the User Representatives, support functions such as the Project Support Office and project assistance, and operational roles. The Project Manager prepares the matrix in the Planning Phase, supported by the Business Manager, and keeps it up to date.
Equivalents in other frameworks
Concept Identifying and assessing stakeholders · one framework reviewed
| Framework | Term there | Relation | Note |
|---|---|---|---|
| general | Stakeholder analysis | partially overlapping | mainly records roles and contact details, less the assessment of influence and attitude |
The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.
Classification
- this term
- Project Stakeholder Matrix
- Topic area
- Stakeholders and communication
Distinction
A stakeholder analysis assesses interests, influence and attitudes; the Project Stakeholder Matrix is primarily a directory of the people involved and their roles, which can be supplemented with such assessments. Who does what for individual tasks is defined in the RASCI table.
In practice
In a project for a data centre shared by three rural districts, the matrix contains 42 entries, from the district administrators on the Project Steering Committee to the caretakers at the sites. The classification column shows that the staff councils have a high level of influence; they are therefore added to the communication plan.
Frequently asked questions
When is the Project Stakeholder Matrix prepared?
It is drawn up or updated in the Planning Phase and then maintained throughout the project.
How detailed does the matrix need to be?
It is adapted to the project. Small projects manage with name, role and contact details, while large ones add classifications and communication needs.
Source and context
- Reference
- PM²-Leitfaden 3.1, Abschnitt 6.3
- Edition
- PM² Guide 3.1
Cite this entry
Project Stakeholder Matrix. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-stakeholder-matrix/
Project Stakeholder Matrix (n.d.). PMDecoder, entry on PM²-Leitfaden 3.1, Abschnitt 6.3. https://pmdecoder.com/en/glossary/project-stakeholder-matrix/ (retrieved 24 November 2026)
@misc{projectstakeholdermatrix,
title = {Project Stakeholder Matrix},
note = {PMDecoder, PM²-Leitfaden 3.1, Abschnitt 6.3},
url = {https://pmdecoder.com/en/glossary/project-stakeholder-matrix/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/project-stakeholder-matrix/"> <p>PM² artefact that lists all relevant stakeholders with their contact details and project roles and classifies them where needed</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-stakeholder-matrix/">Project Stakeholder Matrix</a>, PMDecoder, PM²-Leitfaden 3.1, Abschnitt 6.3</footer> </blockquote>
Found a mistake? Let us know, we check every report.