Requirement

Definition

In PMI usage, a requirement is a capability or condition that a product, result or service must possess so that a business need is satisfied. Requirements are elicited from stakeholders, analysed, documented and prioritized. PMI distinguishes several levels, such as business requirements, requirements of individual stakeholders and solution requirements, which are in turn divided into functional and non-functional ones. To ensure that no requirement is lost, each one is linked to objectives, deliverables and tests by means of a traceability matrix.

Equivalents in other frameworks

Concept Condition a result must meet · three frameworks reviewed

Equivalents of Requirement in other frameworks
FrameworkTerm thereRelationNote
generalRequirementequivalent—
Six SigmaVoice of the Customerpartially overlappingPrecursor of requirements: customers’ statements and expectations in their own words, before measurable requirements are derived.
Six SigmaCritical to Qualitypartially overlappingSpecial form: only the requirements that are decisive for customers, stated measurably with target value and limits.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Requirement

Distinction

The cross-framework term requirement refers to the same thing; this entry describes the PMI view of it. Acceptance criteria define how fulfilment is checked and are therefore narrower. A constraint restricts the way a solution can be reached but does not describe a property the result is meant to have.

In practice

For new warehouse management software, the project team elicits requirements in workshops with the warehouse, purchasing and IT. Warehouse management requires every booking made with a hand scanner to be confirmed in under two seconds; IT requires log-in through the existing directory. Both requirements are given a number, a source and a test case. When purchasing later asks for an interface to a supplier, traceability shows that no objective and no budget have yet been agreed for it.

Frequently asked questions

What makes a good requirement?

It is unambiguous, testable, assigned to a source and worded so that it states what is needed without anticipating the solution. Measurable figures such as response times or quantities make later acceptance easier.

What is requirements traceability for?

It shows where each requirement comes from, where it is implemented and how it is verified. This makes it possible to see whether something is missing or whether work is being done for which there is no requirement.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Requirement. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/requirement-pmi/

Short form

Requirement (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/requirement-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{requirementpmi,
  title   = {Requirement},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/requirement-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/requirement-pmi/">
  <p>Property or ability a result must have to meet a business need; gathered from stakeholders and traced through to acceptance.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/requirement-pmi/">Requirement</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.