Project calendar

Definition

In PMI usage, the project calendar is a calendar showing on which working days and in which shifts scheduled activities can take place. It distinguishes working time from non-working time such as weekends, public holidays or company shutdowns. The schedule model uses this calendar to convert durations into specific start and finish dates. In addition, resource calendars can reflect the availability of individual people or equipment, and different calendars can apply to particular activities, for example work carried out in shifts.

Equivalents in other frameworks

Concept Working time rules of a project · three frameworks reviewed

Equivalents of Project calendar in other frameworks
FrameworkTerm thereRelationNote
generalProject calendarequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Project calendar
Topic area
Scheduling

Distinction

The cross-framework project calendar refers to the same thing; this entry gives the PMI view. A resource calendar applies only to one resource, for example with leave or part-time work, whereas the project calendar applies to the project as a whole. The project schedule contains the dates, the project calendar only the rules by which they are calculated.

In practice

An internationally distributed software project works with teams in Germany and India. The project calendar sets a five-day week; each team has its own calendar with its public holidays. Because the teams have different holidays, the planning tool automatically moves a handover by two days when an Indian public holiday falls within the planned period.

Frequently asked questions

Why does a project need its own calendar?

Because durations are estimated in work periods. Without defined working days and shifts, they cannot be converted into dates reliably, and public holidays or shutdowns would be overlooked.

What happens when the calendar changes?

All affected dates move. If, for example, an additional Saturday is scheduled as a working day, subsequent activities move forward. Such changes should therefore be made deliberately and documented.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Project calendar. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/project-calendar-pmi/

Short form

Project calendar (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/project-calendar-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{projectcalendarpmi,
  title   = {Project calendar},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/project-calendar-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/project-calendar-pmi/">
  <p>Calendar in the schedule model that fixes the days and shifts on which work may be done, turning durations into concrete dates.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/project-calendar-pmi/">Project calendar</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.