Methodology

Definition

In PMI’s terms a methodology is a coherent set of rules, practices, techniques and procedures that practitioners of a discipline apply. In project management it specifies which steps take place in which order, what roles exist, which documents are produced and how decisions are taken. Organizations develop their own methodologies or adopt widely used approaches and tailor them. PMI deliberately distinguishes its standards from this: the PMBOK Guide describes foundations and proven practices that can serve as building blocks for a methodology but is not one itself. A methodology should be tailored to the type, size and environment of the project rather than applied rigidly.

Equivalents in other frameworks

Concept Defined framework for how a project proceeds · three frameworks reviewed

Equivalents of Methodology in other frameworks
FrameworkTerm thereRelationNote
generalProcess modelclosely relatedgenerally denotes a system of practices and rules, not only the process framework
Six SigmaDMAICpartially overlappingSpecial form of a methodology, limited to projects that improve existing processes.
Six SigmaDesign for Six Sigmapartially overlappingSpecial form of a methodology for developing new products and processes, usually following the DMADV cycle.

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Methodology

Distinction

The cross-framework term process model is closely related but mainly describes the sequence of phases and activities; a methodology in PMI’s sense also includes rules, roles and techniques. In everyday language methodology is often used as a synonym for method; strictly speaking, a single method is only one part of it. Frameworks such as PRINCE2 or PM² are examples of fully worked-out methodologies.

In practice

A regional authority introduces a mandatory project methodology. It defines four phases with approval decisions, describes the roles of sponsor, project manager and quality officer, provides templates for the project mandate and the status report, and allows an iterative approach for software undertakings within the implementation phase.

Frequently asked questions

Does every organization need its own methodology?

Not necessarily, but a common basis makes collaboration, comparability and training easier. Many organizations adopt a widely used framework and add their own rules.

Is Scrum a methodology?

Scrum describes itself as a lightweight framework that deliberately leaves much open. In PMI’s broader sense it can serve as the basis of a methodology.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Methodology. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/methodology/

Short form

Methodology (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/methodology/ (retrieved 24 November 2026)

BibTeX
@misc{methodology,
  title   = {Methodology},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/methodology/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/methodology/">
  <p>Defined combination of steps, roles, techniques and rules that guides how work is done in a particular field.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/methodology/">Methodology</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.