Statement of work

abbr. SOW

Definition

A statement of work specifies what a contractor is to deliver or do. It contains the purpose of the work, the required results, technical and organizational requirements, dates, the client's obligations to cooperate and the criteria for acceptance. In procurement procedures it is the basis on which bidders calculate their prices and make their offers comparable.

Equivalents in other frameworks

Concept Description of work to be performed · one framework reviewed

Equivalents of Statement of work in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKStatement of workequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Statement of work

Distinction

The customer requirements specification (Lastenheft) describes requirements from the client's point of view and can serve as a statement of work; the functional specification (Pflichtenheft) is the contractor's response setting out its solution. In construction, a statement of work with a bill of quantities (Leistungsverzeichnis) is common, dividing the work into individual items with quantities. A functional statement of work, by contrast, names only objectives and requirements and leaves the solution to the bidder.

In practice

A university puts the operation of its learning platform out to tender. The statement of work specifies availability, support hours, data protection requirements, interfaces to student administration and handover at the end of the contract. Because the support hours are initially stated only as "during term time", several bidders ask for clarification. The university clarifies the information for all bidders at the same time so that the offers remain comparable.

Frequently asked questions

How detailed should a statement of work be?

Precise enough for different bidders to understand the same thing by it, but open enough not to rule out better solutions.

Where is the term statement of work used?

It is the term customary in English-speaking countries for a contractual description of the work (in German, Leistungsbeschreibung), often as an annex to a framework agreement.

Source and context

Cite this entry
APA

Hain, D. (n.d.). Statement of work. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/statement-of-work/

Short form

Hain, D. (n.d.): Statement of work. PMDecoder. https://pmdecoder.com/en/glossary/statement-of-work/ (retrieved 24 November 2026)

BibTeX
@misc{statementofwork,
  author  = {Hain, Dennis},
  title   = {Statement of work},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/statement-of-work/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/statement-of-work/">
  <p>Document describing the nature, scope and quality of a service or delivery so that it can be tendered, delivered and verified</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/statement-of-work/">Statement of work</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.