Secondary risk

Definition

In PMI terms, a secondary risk is a risk that arises only because a risk response is implemented. Every action changes the project: it ties up staff, shifts dates, or brings in new partners or technologies. Uncertainties of their own can follow from this. PMI recommends asking specifically about such follow-on risks when planning responses, recording them in the risk register, and assessing and treating them like other risks. A response only makes sense if the new risks weigh less overall than the original one.

Equivalents in other frameworks

Concept Risk arising from a response · three frameworks reviewed

Equivalents of Secondary risk in other frameworks
FrameworkTerm thereRelationNote
generalSecondary riskequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

Broader term
Risk
this term
Secondary risk

Distinction

The term corresponds to the cross-framework concept of secondary risk. A residual risk is the part of the original risk that remains after the response; a secondary risk is a different, new risk. Residual risk in ISO 21506 corresponds to PMI's residual risk, not to secondary risk.

In practice

To mitigate schedule delays caused by an unreliable supplier, a mechanical engineering project engages a second supplier. Its components come from a different plant and could have slightly different dimensions. The team records this as a secondary risk and plans an additional incoming inspection.

Frequently asked questions

Does every secondary risk need a response of its own?

It is assessed like any other risk. If it lies above the thresholds it needs its own response; otherwise it can be accepted and monitored.

Why is identifying secondary risks important?

Without this view, a well-intended action can leave the project worse off overall. The assessment shows whether the response pays off on balance.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Secondary risk. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/secondary-risk-pmi/

Short form

Secondary risk (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/secondary-risk-pmi/ (retrieved 24 November 2026)

BibTeX
@misc{secondaryriskpmi,
  title   = {Secondary risk},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/secondary-risk-pmi/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/secondary-risk-pmi/">
  <p>Follow-on risk that arises only because a risk response is carried out and must be assessed and handled like any other risk.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/secondary-risk-pmi/">Secondary risk</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.