Shop floor management

Definition

In shop floor management, teams and their managers meet at fixed intervals, usually daily and standing, directly at the workplace in front of a board. The board shows a few metrics, for example on safety, quality, volume and schedule, together with problems that have occurred and agreed actions with owners. Problems that the team cannot solve itself are passed on in a defined cascade to the next management level, which in turn meets shortly afterwards. In this way, information reaches the level that can decide within a few hours. The term is particularly widespread in German-speaking countries.

Equivalents in other frameworks

No equivalents have been recorded for this term yet.

Distinction

The gemba is the place, shop floor management the fixed leadership routine at that place. The Daily Scrum in Scrum is also a short daily meeting, but it serves the team’s planning for the next working day and has no cascade across management levels. An obeya steers a single undertaking, shop floor management the ongoing work of an area.

In practice

In the maintenance department of a transport operator, each workshop shift meets at seven o’clock for ten minutes at its board and discusses the day’s vehicles and open faults. Anything missing, such as spare parts, goes to the supervisors’ round at half past seven and to the workshop management round at eight. Spare parts shortages that used to go unnoticed for days are now resolved the same morning.

Frequently asked questions

How long should shop floor meetings last?

Briefly, usually ten to fifteen minutes. They serve to provide an overview and to trigger actions; the actual problem solving takes place afterwards in a small group.

Can shop floor management be used in offices?

Yes. Administrations, development departments and project teams use it with physical or digital boards and metrics that suit their work.

Source and context

Cite this entry
APA

Shop floor management. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/shop-floor-management/

Short form

Shop floor management (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/shop-floor-management/ (retrieved 24 November 2026)

BibTeX
@misc{shopfloormanagement,
  title   = {Shop floor management},
  note    = {PMDecoder},
  url     = {https://pmdecoder.com/en/glossary/shop-floor-management/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/shop-floor-management/">
  <p>Leadership at the place of value creation through short, regular meetings at boards in which metrics, problems and actions are tracked.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/shop-floor-management/">Shop floor management</a>, PMDecoder</footer>
</blockquote>

Found a mistake? Let us know, we check every report.