Risk contingency reserve

Definition

The risk contingency reserve covers the financial or time-related consequences of identified risks that have been accepted or not fully mitigated. Its size is derived from risk analysis, for example from the sum of expected monetary values or from a simulation. It forms part of the budget or schedule but is kept separately so that its use remains visible.

Equivalents in other frameworks

Concept Allowance for known risks · three frameworks reviewed

Equivalents of Risk contingency reserve in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKContingency reserveequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Risk contingency reserve

Distinction

The risk contingency reserve applies to identified risks, the management reserve to unforeseeable events; the management reserve is usually controlled not by the project manager but by a higher authority. A flat surcharge unrelated to specific risks is not a risk contingency reserve in the strict sense. Float results from schedule calculation, whereas a schedule buffer is set deliberately.

In practice

A software project with a budget of 1.2 million euros assesses its twenty most significant risks. The expected monetary values add up to around 90,000 euros, which is planned as a risk contingency reserve. When one of these risks materializes and an interface has to be redeveloped, the project manager draws 35,000 euros and documents the drawdown with reference to the risk. Since then, the status report has shown the remaining reserve alongside the budget.

Frequently asked questions

How large should a risk contingency reserve be?

That depends on the risk situation. A figure derived from assessed risks or a simulation is robust; a fixed percentage without justification is not.

What happens to an unused reserve?

It is released at the end of the project or when the risks no longer apply. It should not be used for new requests.

Source and context

Reference
ISO 21506:2024, 3.79
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Risk contingency reserve. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/risk-contingency-reserve/

Short form

Hain, D. (n.d.): Risk contingency reserve. PMDecoder, entry on ISO 21506:2024, 3.79. https://pmdecoder.com/en/glossary/risk-contingency-reserve/ (retrieved 24 November 2026)

BibTeX
@misc{riskcontingencyreserve,
  author  = {Hain, Dennis},
  title   = {Risk contingency reserve},
  note    = {PMDecoder, ISO 21506:2024, 3.79},
  url     = {https://pmdecoder.com/en/glossary/risk-contingency-reserve/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/risk-contingency-reserve/">
  <p>Time or budget allowance planned for identified risks, to be used only if they materialize.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/risk-contingency-reserve/">Risk contingency reserve</a>, PMDecoder, ISO 21506:2024, 3.79</footer>
</blockquote>

Found a mistake? Let us know, we check every report.