Overhead costs
also: Overhead, Indirect costs
Definition
Overhead costs arise for the organization as a whole or for several projects jointly, for example for administration, premises, IT, senior management or sales. Because they cannot be attributed to a single project on a cause-and-effect basis, they are allocated through surcharge rates, for example on staff costs. In pricing bids and in project controlling, the way they are treated determines whether a project is regarded as profitable.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Classification
- this term
- Overhead costs
- Topic area
- Cost and economic viability
Distinction
Direct costs can be assigned to a project directly, such as materials or booked hours; overhead costs cannot. In construction, a distinction is made between site overheads, which are assigned to a particular site, and the general business costs of the company. Fixed costs and overhead costs are not the same: overhead costs can also vary with utilization.
In practice
An engineering consultancy prices its bids with an overhead surcharge of 90 per cent on staff costs. The post-calculation shows that small projects, despite the same surcharge, cause considerably more administrative effort for bids, coordination and invoices. For contracts below a certain size, the consultancy introduces a flat fee for project administration and thereby achieves a more realistic result per project.
Frequently asked questions
How are overhead costs allocated to projects?
Usually through surcharge rates on a reference value such as staff costs or hours. Allocation according to the services actually used is more accurate but takes more effort.
Do overhead costs belong in the project budget?
That depends on the organization's rules. They are almost always included when pricing bids, whereas internal project control often considers only the costs that can be directly influenced.
Source and context
- Author
- Dennis Hain
Cite this entry
Hain, D. (n.d.). Overhead costs. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/overhead-costs/
Hain, D. (n.d.): Overhead costs. PMDecoder. https://pmdecoder.com/en/glossary/overhead-costs/ (retrieved 24 November 2026)
@misc{overheadcosts,
author = {Hain, Dennis},
title = {Overhead costs},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/overhead-costs/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/overhead-costs/"> <p>Costs that cannot be assigned directly to an individual project or product and are allocated through surcharges</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/overhead-costs/">Overhead costs</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.