Estimate to complete

abbr. ETC

Definition

The estimate to complete looks only ahead. It states which costs will still arise from the cut-off date until all the work is finished. The most reliable approach is a fresh estimate of the open work packages by the people responsible for them; a quick approximation can be extrapolated from the remaining budget and the performance indices so far. Added to actual cost, it gives the estimate at completion.

Equivalents in other frameworks

Concept Expected cost of the remaining work · one framework reviewed

Equivalents of Estimate to complete in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKEstimate to completeequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Estimate to complete

Distinction

The remaining budget, that is, budget at completion minus earned value, says what the open work may cost according to plan. The estimate to complete says what it is likely to cost. If the two differ significantly, that is an early warning sign, even if the cost variance so far is still small.

In practice

When a data centre is being built, three work packages with a remaining budget of 600,000 euros are still open after eight months. Those responsible re-estimate them: the air-conditioning will cost 80,000 euros more because of higher prices, the cabling 20,000 euros less. The estimate to complete is therefore 660,000 euros. Because these additional costs have not yet been incurred, they do not appear in any cost variance, but they do show up in the forecast.

Frequently asked questions

Who prepares the estimate to complete?

Ideally the people responsible for the outstanding work, such as the control account managers. The project manager checks the estimates for plausibility.

May the estimate be lower than the remaining budget?

Yes, if the work can genuinely be done more cheaply, for example thanks to better prices. A strikingly low estimate should, however, be justified.

Source and context

Reference
ISO 21506:2024, 3.26
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Estimate to complete. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/estimate-to-complete/

Short form

Hain, D. (n.d.): Estimate to complete. PMDecoder, entry on ISO 21506:2024, 3.26. https://pmdecoder.com/en/glossary/estimate-to-complete/ (retrieved 24 November 2026)

BibTeX
@misc{estimatetocomplete,
  author  = {Hain, Dennis},
  title   = {Estimate to complete},
  note    = {PMDecoder, ISO 21506:2024, 3.26},
  url     = {https://pmdecoder.com/en/glossary/estimate-to-complete/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/estimate-to-complete/">
  <p>Expected cost of all the work still outstanding at the cut-off date, for example in a project or a single work package.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/estimate-to-complete/">Estimate to complete</a>, PMDecoder, ISO 21506:2024, 3.26</footer>
</blockquote>

Found a mistake? Let us know, we check every report.