Critical path

Definition

The critical path is the longest route from start to finish through a network schedule. Every activity on it has zero total float, provided the target date matches the result of the forward pass. If an activity on this path is delayed, the whole project is delayed; if it is shortened, the project can finish earlier until another path becomes critical. A network schedule can have several critical paths at once.

Equivalents in other frameworks

Concept Longest sequence of activities without float · three frameworks reviewed

Equivalents of Critical path in other frameworks
FrameworkTerm thereRelationNote
PMI / PMBOKCritical pathequivalent—
Scrum—no counterpart—
Kanban—no counterpart—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Critical path

Distinction

Each individual activity on this path is a critical activity. The critical path method is the calculation procedure that determines it. In critical chain project management, it is replaced by the critical chain, which also takes resource constraints into account.

In practice

In the refurbishment of a wastewater treatment plant, the critical path consists of the permit, the tender for the mechanical equipment, delivery of the blowers, installation and trial operation; the construction work itself has float. The project manager therefore does not put pressure on the building contractors but negotiates a shorter delivery time with the blower manufacturer. Afterwards the software shows that the concrete work is now on the critical path.

Frequently asked questions

Why can the critical path change?

Because activities run faster or slower than planned. A path with little float becomes critical as soon as that float has been used up.

Are activities off the critical path unimportant?

No. They have leeway in time but are often just as important in content and can themselves become critical if they are delayed.

Source and context

Reference
ISO 21506:2024, 3.18
Edition
ISO 21506:2024
Cite this entry
APA

Hain, D. (n.d.). Critical path. In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/critical-path/

Short form

Hain, D. (n.d.): Critical path. PMDecoder, entry on ISO 21506:2024, 3.18. https://pmdecoder.com/en/glossary/critical-path/ (retrieved 24 November 2026)

BibTeX
@misc{criticalpath,
  author  = {Hain, Dennis},
  title   = {Critical path},
  note    = {PMDecoder, ISO 21506:2024, 3.18},
  url     = {https://pmdecoder.com/en/glossary/critical-path/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/critical-path/">
  <p>Sequence of activities in the network schedule without float whose total duration determines the earliest finish of a project or phase.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/critical-path/">Critical path</a>, PMDecoder, ISO 21506:2024, 3.18</footer>
</blockquote>

Found a mistake? Let us know, we check every report.