Muda
Definition
In Lean thinking, muda is the collective term for everything that causes effort but adds no value from the customer’s point of view. Traditionally, seven types of waste are distinguished: transport, the unnecessary movement of materials or information; inventory that sits idle and ties up capital; motion of people, such as searching and walking; waiting; overproduction, making more or earlier than needed; over-processing, putting in more effort than required; and defects with their corrections. Many descriptions add unused employee skills as an eighth type. A further distinction is made between activities that are currently necessary, such as legally required checks, and those that can be dropped at once.
Equivalents in other frameworks
No equivalents have been recorded for this term yet.
Distinction
Together with muri, overburden, and mura, unevenness, muda forms the three types of loss in the Toyota Production System. Muri and mura are often causes, muda is the visible effect. Rework is an example of the waste type defects. The cost of quality captures losses in money, whereas muda describes them as activities in the process.
In practice
In an IT project, reports for the steering committee are prepared every week in three formats, although the members read only one; this is over-processing. Completed features wait six weeks for the next test cycle; this is inventory and waiting. The project team lists such cases in a retrospective according to the seven types, drops two report formats and switches to weekly testing.
Frequently asked questions
Why is the entry called muda rather than waste?
The English word is very general and is used well beyond Lean. The Japanese term makes clear that the Lean meaning, with its types of waste, is intended.
Can all waste be eliminated?
No. Some activities create no value but are currently unavoidable, such as mandatory documentation. They are reduced as far as possible; only the remaining waste can be removed entirely.
Source and context
Cite this entry
Muda. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/muda/
Muda (n.d.). PMDecoder. https://pmdecoder.com/en/glossary/muda/ (retrieved 24 November 2026)
@misc{muda,
title = {Muda},
note = {PMDecoder},
url = {https://pmdecoder.com/en/glossary/muda/},
urldate = {2026-11-24}
}Embed this definition
HTML fragment for your own website: short definition with source and link, no script and no tracking.
<blockquote cite="https://pmdecoder.com/en/glossary/muda/"> <p>Japanese for waste: any activity that consumes time or resources without creating value for the customer.</p> <footer>Source: <a href="https://pmdecoder.com/en/glossary/muda/">Muda</a>, PMDecoder</footer> </blockquote>
Found a mistake? Let us know, we check every report.