Colocation

Definition

At PMI, colocation refers to a strategy of having project team members work physically close to one another. People who sit in the same room or building clarify questions faster, pick up context along the way and build trust more easily. Colocation may apply for the entire duration or only for particularly important stretches, such as planning or an integration phase. Often a dedicated team room is set up, where plans, boards and metrics are visible to everyone.

Equivalents in other frameworks

Concept Shared workplace of a project team · one framework reviewed

Equivalents of Colocation in other frameworks
FrameworkTerm thereRelationNote
generalCo-locationequivalent—

The circles show how far the meanings overlap: on top of each other equivalent, large overlap closely related, small overlap partially overlapping, separate false friend.

All designations of this concept side by side

Classification

this term
Colocation

Distinction

The concept is described in the glossary under the cross-framework term “Co-Location”; the PMI term, written as one word, is equivalent. Its opposite is the virtual team, whose members mostly work in different places. Many projects combine both, for example with fixed days in the office. Colocation concerns the place of work, not membership of the line organization.

In practice

For the migration of a data centre, an insurance company brings specialists from three sites together in a shared project room for eight weeks. The migration plan hangs on the wall, and problems are resolved on the spot. After the systems have moved, the participants return to their home sites and coordinate in short video calls.

Frequently asked questions

Is colocation worthwhile for short periods?

Often, yes. Even a few weeks of working together at the start or in critical phases foster trust and shared understanding, from which the team benefits later when distributed.

What are the drawbacks of colocation?

It causes costs for premises and travel, ties people to one place and can make access to experts at other sites harder. Constant interruptions can also disturb focused work.

Source and context

Reference
PMI Lexicon of Project Management Terms 4.0 (2024)
Edition
PMBOK Guide – Eighth Edition
Cite this entry
APA

Colocation. (n.d.). In PMDecoder. Retrieved 24 November 2026, from https://pmdecoder.com/en/glossary/colocation/

Short form

Colocation (n.d.). PMDecoder, entry on PMI Lexicon of Project Management Terms 4.0 (2024). https://pmdecoder.com/en/glossary/colocation/ (retrieved 24 November 2026)

BibTeX
@misc{colocation,
  title   = {Colocation},
  note    = {PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)},
  url     = {https://pmdecoder.com/en/glossary/colocation/},
  urldate = {2026-11-24}
}

Embed this definition

HTML fragment for your own website: short definition with source and link, no script and no tracking.

HTML
<blockquote cite="https://pmdecoder.com/en/glossary/colocation/">
  <p>Housing a project team’s members at one site so that they communicate more easily, cooperate better and work more productively.</p>
  <footer>Source: <a href="https://pmdecoder.com/en/glossary/colocation/">Colocation</a>, PMDecoder, PMI Lexicon of Project Management Terms 4.0 (2024)</footer>
</blockquote>

Found a mistake? Let us know, we check every report.